About: Redbridge Cycling Centre     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Venue108677628, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FRedbridge_Cycling_Centre

Redbridge Cycling Centre is a road cycle circuit and mountain bike course at Hog Hill – near Hainault Forest Country Park and directly opposite the Forest Cemetery and Crematorium. The £5m cost of the facility was funded by the London Development Agency (LDA) as a replacement the former Eastway cycle facilities that were redeveloped for the London Olympic Park. The LDA funded the facility up to the completion of the legacy London Velopark. It was opened by Boris Johnson in August 2008.

AttributesValues
rdf:type
rdfs:label
  • Redbridge Cycling Centre (en)
rdfs:comment
  • Redbridge Cycling Centre is a road cycle circuit and mountain bike course at Hog Hill – near Hainault Forest Country Park and directly opposite the Forest Cemetery and Crematorium. The £5m cost of the facility was funded by the London Development Agency (LDA) as a replacement the former Eastway cycle facilities that were redeveloped for the London Olympic Park. The LDA funded the facility up to the completion of the legacy London Velopark. It was opened by Boris Johnson in August 2008. (en)
geo:lat
geo:long
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
georss:point
  • 51.606 0.127
has abstract
  • Redbridge Cycling Centre is a road cycle circuit and mountain bike course at Hog Hill – near Hainault Forest Country Park and directly opposite the Forest Cemetery and Crematorium. The £5m cost of the facility was funded by the London Development Agency (LDA) as a replacement the former Eastway cycle facilities that were redeveloped for the London Olympic Park. The LDA funded the facility up to the completion of the legacy London Velopark. It was opened by Boris Johnson in August 2008. In 2014, Redbridge Council agreed to purchase Redbridge Cycling Centre from the Crown Estate using a grant from the London Marathon Charitable Trust. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(0.12700000405312 51.60599899292)
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 51 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software