About: Rail Splitter Wind Farm     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FRail_Splitter_Wind_Farm

The Rail Splitter Wind Farm is a 67-turbine wind farm in northern Logan County and southern Tazewell County in the U.S. state of Illinois. The turbines are expected to generate a maximum of 100.5 megawatts of electricity. The wind farm is owned and operated by Horizon Wind Energy. The wind turbines that constitute the farm are centered on the town of Emden on both sides of Interstate 155. The wind farm, constructed in 2008–2009 at a cost of $200.0 million, was dedicated on July 21, 2009.

AttributesValues
rdf:type
rdfs:label
  • Rail Splitter Wind Farm (en)
rdfs:comment
  • The Rail Splitter Wind Farm is a 67-turbine wind farm in northern Logan County and southern Tazewell County in the U.S. state of Illinois. The turbines are expected to generate a maximum of 100.5 megawatts of electricity. The wind farm is owned and operated by Horizon Wind Energy. The wind turbines that constitute the farm are centered on the town of Emden on both sides of Interstate 155. The wind farm, constructed in 2008–2009 at a cost of $200.0 million, was dedicated on July 21, 2009. (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Logan_County_wind_farm_from_US_136.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
thumbnail
georss:point
  • 40.3 -89.4
has abstract
  • The Rail Splitter Wind Farm is a 67-turbine wind farm in northern Logan County and southern Tazewell County in the U.S. state of Illinois. The turbines are expected to generate a maximum of 100.5 megawatts of electricity. The wind farm is owned and operated by Horizon Wind Energy. The wind turbines that constitute the farm are centered on the town of Emden on both sides of Interstate 155. The wind farm, constructed in 2008–2009 at a cost of $200.0 million, was dedicated on July 21, 2009. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-89.400001525879 40.299999237061)
is Link from a Wikipage to another Wikipage of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 37 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software