Olimpijski Bazen Otoka is an indoor water arena in Sarajevo, Bosnia and Herzegovina. It is located in the Novi Grad district. Construction was finished in 2008, making it the first olympic sized swimming pool in Sarajevo. Construction started in 2005. The main pool has a dimension of 50 times 25 meters, with a depth of 2.2 meters. There are 10 lanes. There is an additional smaller pool in this building. The main pool is in regulations with FINA requirements.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Olimpijski Bazen Otoka (en)
|
rdfs:comment
| - Olimpijski Bazen Otoka is an indoor water arena in Sarajevo, Bosnia and Herzegovina. It is located in the Novi Grad district. Construction was finished in 2008, making it the first olympic sized swimming pool in Sarajevo. Construction started in 2005. The main pool has a dimension of 50 times 25 meters, with a depth of 2.2 meters. There are 10 lanes. There is an additional smaller pool in this building. The main pool is in regulations with FINA requirements. (en)
|
foaf:name
| - Olimpijski Bazen Otoka (en)
|
foaf:homepage
| |
name
| - Olimpijski Bazen Otoka (en)
|
geo:lat
| |
geo:long
| |
foaf:depiction
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
broke ground
| |
capacity
| |
construction cost
| |
location
| - Bulevar Meše Selimovića 83b, Sarajevo 71000, Bosnia and Herzegovina (en)
|
opened
| |
surface
| |
tenants
| |
georss:point
| - 43.84741666666667 18.359555555555556
|
has abstract
| - Olimpijski Bazen Otoka is an indoor water arena in Sarajevo, Bosnia and Herzegovina. It is located in the Novi Grad district. Construction was finished in 2008, making it the first olympic sized swimming pool in Sarajevo. Construction started in 2005. The main pool has a dimension of 50 times 25 meters, with a depth of 2.2 meters. There are 10 lanes. There is an additional smaller pool in this building. The main pool is in regulations with FINA requirements. The construction cost was 15.5 million convertible marks, 11.5 came from city Sarajevo, 3.5 from Canton Sarajevo, and 1 million came from the BH Government. (en)
|
gold:hypernym
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
building start date
| |
seating capacity
| |
tenant
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(18.35955619812 43.847415924072)
|
is Link from a Wikipage to another Wikipage
of | |
is stadium
of | |
is home venue
of | |
is Stadium
of | |
is foaf:primaryTopic
of | |