About: Olimpijski Bazen Otoka     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : umbel-rc:Stadium, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FOlimpijski_Bazen_Otoka

Olimpijski Bazen Otoka is an indoor water arena in Sarajevo, Bosnia and Herzegovina. It is located in the Novi Grad district. Construction was finished in 2008, making it the first olympic sized swimming pool in Sarajevo. Construction started in 2005. The main pool has a dimension of 50 times 25 meters, with a depth of 2.2 meters. There are 10 lanes. There is an additional smaller pool in this building. The main pool is in regulations with FINA requirements.

AttributesValues
rdf:type
rdfs:label
  • Olimpijski Bazen Otoka (en)
rdfs:comment
  • Olimpijski Bazen Otoka is an indoor water arena in Sarajevo, Bosnia and Herzegovina. It is located in the Novi Grad district. Construction was finished in 2008, making it the first olympic sized swimming pool in Sarajevo. Construction started in 2005. The main pool has a dimension of 50 times 25 meters, with a depth of 2.2 meters. There are 10 lanes. There is an additional smaller pool in this building. The main pool is in regulations with FINA requirements. (en)
foaf:name
  • Olimpijski Bazen Otoka (en)
foaf:homepage
name
  • Olimpijski Bazen Otoka (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Sarajevo_Vistafon_2011-11-11.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
broke ground
capacity
construction cost
location
  • Bulevar Meše Selimovića 83b, Sarajevo 71000, Bosnia and Herzegovina (en)
opened
surface
tenants
georss:point
  • 43.84741666666667 18.359555555555556
has abstract
  • Olimpijski Bazen Otoka is an indoor water arena in Sarajevo, Bosnia and Herzegovina. It is located in the Novi Grad district. Construction was finished in 2008, making it the first olympic sized swimming pool in Sarajevo. Construction started in 2005. The main pool has a dimension of 50 times 25 meters, with a depth of 2.2 meters. There are 10 lanes. There is an additional smaller pool in this building. The main pool is in regulations with FINA requirements. The construction cost was 15.5 million convertible marks, 11.5 came from city Sarajevo, 3.5 from Canton Sarajevo, and 1 million came from the BH Government. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • 2005
seating capacity
tenant
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(18.35955619812 43.847415924072)
is Link from a Wikipage to another Wikipage of
is stadium of
is home venue of
is Stadium of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 54 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software