The Mekin Hydroelectric Power Station, also referred to as Mekin Power Station, is a 15 MW (20,000 hp) hydroelectric power station, in Cameroon. This power station has been under construction since early 2010s, with initial commissioning planned for 2015. However, the project has been beset by multiple delays, plant shutdowns and restarts. The power station was partially re-started in June 2022 to allow the generation and evacuation of 11.25 MW of electricity, comprising 75 percent of maximum capacity. When current production testing is concluded, it is expected that the final unit will be brought online during the fourth quarter of 2022.

AttributesValues
rdf:type
rdfs:label
  • Mekin Hydroelectric Power Station (en)
rdfs:comment
  • The Mekin Hydroelectric Power Station, also referred to as Mekin Power Station, is a 15 MW (20,000 hp) hydroelectric power station, in Cameroon. This power station has been under construction since early 2010s, with initial commissioning planned for 2015. However, the project has been beset by multiple delays, plant shutdowns and restarts. The power station was partially re-started in June 2022 to allow the generation and evacuation of 11.25 MW of electricity, comprising 75 percent of maximum capacity. When current production testing is concluded, it is expected that the final unit will be brought online during the fourth quarter of 2022. (en)
foaf:name
  • Mekin Hydroelectric Power Station (en)
name
  • Mekin Hydroelectric Power Station (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
cost
country
location
  • Mekin, Dja and Lobo Department, South Region (Cameroon) (en)
location map
  • Cameroon (en)
purpose
  • P (en)
status
  • UC (en)
georss:point
  • 3.2594444444444446 12.421388888888888
has abstract
  • The Mekin Hydroelectric Power Station, also referred to as Mekin Power Station, is a 15 MW (20,000 hp) hydroelectric power station, in Cameroon. This power station has been under construction since early 2010s, with initial commissioning planned for 2015. However, the project has been beset by multiple delays, plant shutdowns and restarts. The power station was partially re-started in June 2022 to allow the generation and evacuation of 11.25 MW of electricity, comprising 75 percent of maximum capacity. When current production testing is concluded, it is expected that the final unit will be brought online during the fourth quarter of 2022. This renewable energy infrastructure project is under development by Mekin Hydroelectric Development Corporation (Hydro Mekin also HydroMekin), a Cameroonian independent power producer (IPP). The energy off-taker is ENEO Cameroon S.A., the public-private partnership electricity utility company. The electricity is intended for distribution primarily, in the Dja and Lobo Department of the South Region of Cameroon, where the power station is located. (en)
dam crosses
location map caption
  • Map of Cameroon showing the location of Mekin HPP. (en)
plant annual gen
  • ~100 GWh (en)
plant commission
  • Q4 2022 Expected (en)
plant operator
  • HydroMekin (en)
plant turbines
vastest lake
part
river
prov:wasDerivedFrom
page length (characters) of wiki page
purpose
  • P
status
  • UC
country
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(12.421388626099 3.259444475174)
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (62 GB total memory, 60 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software