Line M12, officially referred to as the M12 Göztepe-Ataşehir-Ümraniye line, is a proposed rapid transit line of the İstanbul Metro system, currently under construction in the Asian part of İstanbul, Turkey. The investment budget of the construction is ₺ 2.376 billion (approx. US$670 million). The construction of the metro began with work at the end station 60. Yıl Parkı in August 2017. The tender of this project was canceled on 3 January 2018.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Linea M12 (metropolitana di Istanbul) (it)
- M12 (Istanbul Metro) (en)
|
rdfs:comment
| - Line M12, officially referred to as the M12 Göztepe-Ataşehir-Ümraniye line, is a proposed rapid transit line of the İstanbul Metro system, currently under construction in the Asian part of İstanbul, Turkey. The investment budget of the construction is ₺ 2.376 billion (approx. US$670 million). The construction of the metro began with work at the end station 60. Yıl Parkı in August 2017. The tender of this project was canceled on 3 January 2018. (en)
|
foaf:name
| - (en)
- M12 Göztepe-Ataşehir-Ümraniye (en)
|
name
| - M12 Göztepe-Ataşehir-Ümraniye (en)
|
foaf:depiction
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
stations
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
box width
| |
color
| |
electrification
| |
end
| |
image width
| |
locale
| |
logo
| - Istanbul M12 Line Symbol.svg (en)
|
logo width
| |
map state
| |
operator
| |
owner
| - İstanbul Metropolitan Municipality (en)
|
routes
| |
start
| |
status
| |
system
| |
Tracks
| |
type
| |
has abstract
| - Line M12, officially referred to as the M12 Göztepe-Ataşehir-Ümraniye line, is a proposed rapid transit line of the İstanbul Metro system, currently under construction in the Asian part of İstanbul, Turkey. Built by the Metropolitan Municipality of Istanbul, the line will be 13.030 km (8.096 mi) long with 11 stations, and is expected to go into service in 2024. The travel time between the end stations will be 26 minutes. It is expected that it will carry hourly around 35,000 riders in one direction. The line will run through three districts of Istanbul, namely Kadıköy, Ataşehir and Ümraniye. It will connect to other rapid transit lines at Tütüncü Mehmet Efendi station to Marmaray, at Yenisahra to M4 Kadıköy–Sabiha Gökçen Airport, and at Çarşı to M5 Üsküdar–Çekmeköy. The investment budget of the construction is ₺ 2.376 billion (approx. US$670 million). The construction of the metro began with work at the end station 60. Yıl Parkı in August 2017. The tender of this project was canceled on 3 January 2018. The new mayor Ekrem İmamoğlu announced that the metropolitan municipality restarted the construction works. The line is expected to be operational in 2024. (en)
|
linelength km
| |
line length (μ)
| |
number of stations
| |
prov:wasDerivedFrom
| |