About: Link bus rapid transit     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : owl:Thing, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FLink_bus_rapid_transit

Link, previously known as Rochester Rapid Transit and the Downtown Circulator, is a bus rapid transit line planned for downtown Rochester, Minnesota. The 2.6 mile route would connect downtown Rochester, Mayo Clinic's downtown campus, Mayo Clinic's Saint Mary's campus, University of Minnesota Rochester, and a new 13-acre transit-oriented development at the western terminus. Construction is expected to begin 2022 or 2023, with operations commencing 2025.

AttributesValues
rdfs:label
  • Link bus rapid transit (en)
rdfs:comment
  • Link, previously known as Rochester Rapid Transit and the Downtown Circulator, is a bus rapid transit line planned for downtown Rochester, Minnesota. The 2.6 mile route would connect downtown Rochester, Mayo Clinic's downtown campus, Mayo Clinic's Saint Mary's campus, University of Minnesota Rochester, and a new 13-acre transit-oriented development at the western terminus. Construction is expected to begin 2022 or 2023, with operations commencing 2025. (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Link_BRT_logo.png
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
stations
dbp:wikiPageUsesTemplate
thumbnail
bgcolor
  • #29AAE1 (en)
box width
day
end
  • Downtown Rochester (en)
  • East Transit Village (en)
frequency
image width
level
  • Daily (en)
locale
logo
  • Link BRT logo.png (en)
logo alt
  • Logo for Link (en)
map state
  • collapsed (en)
number
  • Link (en)
operator
routetype
start
  • West Transit Village (en)
status
  • Planning (en)
time
titlecolor
  • #ffffff (en)
via
has abstract
  • Link, previously known as Rochester Rapid Transit and the Downtown Circulator, is a bus rapid transit line planned for downtown Rochester, Minnesota. The 2.6 mile route would connect downtown Rochester, Mayo Clinic's downtown campus, Mayo Clinic's Saint Mary's campus, University of Minnesota Rochester, and a new 13-acre transit-oriented development at the western terminus. Construction is expected to begin 2022 or 2023, with operations commencing 2025. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 67 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software