About: Line 7 (Chengdu Metro)     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:RailwayLine, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FLine_7_%28Chengdu_Metro%29

Line 7 is a loop line of the Chengdu Metro (Chinese: 成都地铁7号线; pinyin: Chéngdū Dìtiě Qī Hào Xiàn). It loops between North railway station, Chengdu University of Technology, Huaishudian, Chengdu East railway station, Sichuan Normal University, Chengdu South railway station, Taipingyuan, Jinsha Museum, Southwest Jiaotong University, and City North Coach Terminal Center. The total length is 38.61 km (23.99 mi). Line 7's color is light blue. The construction of Line 7 began in 2013, and ended in late 2017. According to the Chengdu Metro masterplan it will become the inner circle line, with Line 9 being the outer circle line.

AttributesValues
rdf:type
rdfs:label
  • Line 7 (Chengdu Metro) (en)
  • 청두 지하철 7호선 (ko)
  • 成都地下鉄7号線 (ja)
  • 成都地铁7号线 (zh)
rdfs:comment
  • Line 7 is a loop line of the Chengdu Metro (Chinese: 成都地铁7号线; pinyin: Chéngdū Dìtiě Qī Hào Xiàn). It loops between North railway station, Chengdu University of Technology, Huaishudian, Chengdu East railway station, Sichuan Normal University, Chengdu South railway station, Taipingyuan, Jinsha Museum, Southwest Jiaotong University, and City North Coach Terminal Center. The total length is 38.61 km (23.99 mi). Line 7's color is light blue. The construction of Line 7 began in 2013, and ended in late 2017. According to the Chengdu Metro masterplan it will become the inner circle line, with Line 9 being the outer circle line. (en)
  • 청두 지하철 7호선(중국어: 成都地铁7号线)은 중국 쓰촨성 청두시에 있는 에서 을 다시 한바퀴도는 순환선 하늘색 라인이다. 2017년 12월 6일에 개통돼서 현재 운행 중이며 또한 전 구간이 지하이며 차량기지는 웬만하면 지상 구간이지만 차량기지마저도 지하로 되어 있다. (ko)
  • 成都地下鉄7号線 (せいとちかてつ7ごうせん、中文表記: 成都地铁7号线、英文表記: Chengdu Metro Line 7)は、中華人民共和国四川省成都市を走る成都軌道交通の路線。 (ja)
  • 成都地铁7号线是位于四川省成都市,隶属于成都地铁的一条环状地铁线,线路代表色为天蓝色,于2017年12月6日投入运营。成都地铁7号线为环线,基本沿中环路前行,北侧沿二环路前行,全长38.61公里,设车站31个,其中换乘站18座,串联成都站、成都南站、成都东站3个重要交通枢纽,并与城市快速轨道交通和市域轨道交通的放射线大多数线路相交。地铁采用A型车,初期、近期、远期采用6辆编组。系统最大设计运输能力可达5.58万人次每小时,最高时速80千米。 (zh)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Platform_of_Shizishan_Station01.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
stations
stock
  • Chuanshi (en)
dbp:wikiPageUsesTemplate
thumbnail
caption
  • Platform of (en)
electrification
  • Overhead lines, 1,500 V DC (en)
image width
locale
map state
  • collapsed (en)
open
operator
owner
p
  • Chéngdū Dìtiě Qī Hào Xiàn (en)
routes
s
  • 成都地铁7号线 (en)
start
  • Loop line (en)
status
  • Operational (en)
system
Tracks
type
has abstract
  • Line 7 is a loop line of the Chengdu Metro (Chinese: 成都地铁7号线; pinyin: Chéngdū Dìtiě Qī Hào Xiàn). It loops between North railway station, Chengdu University of Technology, Huaishudian, Chengdu East railway station, Sichuan Normal University, Chengdu South railway station, Taipingyuan, Jinsha Museum, Southwest Jiaotong University, and City North Coach Terminal Center. The total length is 38.61 km (23.99 mi). Line 7's color is light blue. The construction of Line 7 began in 2013, and ended in late 2017. According to the Chengdu Metro masterplan it will become the inner circle line, with Line 9 being the outer circle line. (en)
  • 청두 지하철 7호선(중국어: 成都地铁7号线)은 중국 쓰촨성 청두시에 있는 에서 을 다시 한바퀴도는 순환선 하늘색 라인이다. 2017년 12월 6일에 개통돼서 현재 운행 중이며 또한 전 구간이 지하이며 차량기지는 웬만하면 지상 구간이지만 차량기지마저도 지하로 되어 있다. (ko)
  • 成都地下鉄7号線 (せいとちかてつ7ごうせん、中文表記: 成都地铁7号线、英文表記: Chengdu Metro Line 7)は、中華人民共和国四川省成都市を走る成都軌道交通の路線。 (ja)
  • 成都地铁7号线是位于四川省成都市,隶属于成都地铁的一条环状地铁线,线路代表色为天蓝色,于2017年12月6日投入运营。成都地铁7号线为环线,基本沿中环路前行,北侧沿二环路前行,全长38.61公里,设车站31个,其中换乘站18座,串联成都站、成都南站、成都东站3个重要交通枢纽,并与城市快速轨道交通和市域轨道交通的放射线大多数线路相交。地铁采用A型车,初期、近期、远期采用6辆编组。系统最大设计运输能力可达5.58万人次每小时,最高时速80千米。 (zh)
Character
  • Underground only (en)
daily ridership
depot
  • Cuijiadian (en)
line length (μ)
number of stations
prov:wasDerivedFrom
page length (characters) of wiki page
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 40 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software