The Red Line or Line 5 is one of the three lines of Chennai Metro, Phase 2 Project. The under construction line stretches from to . The line will consist of 48 stations, out of which 6 are underground, 1 at grade and 41 are elevated. The government has announced feasibility studies to extend metro rail's corridor-5 from Thirumangalam to Avadi via Mogappair and Ambattur. At present, the proposed corridor-5 links Madhavaram with Sholinganallur via Koyambedu, Alandur and Madipakkam.
Attributes | Values |
---|---|
rdf:type | |
rdfs:label |
|
rdfs:comment |
|
foaf:name |
|
name |
|
dcterms:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage |
|
sameAs | |
stations |
|
dbp:wikiPageUsesTemplate | |
color |
|
electrification |
|
native name lang |
|
operator | |
owner | |
speed |
|
status |
|
system | |
Tracks |
|
type | |
has abstract |
|
Character |
|
line length (μ) |
|
number of stations | |
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
status |
|
is part of | |
operator | |
owner | |
type | |
foaf:isPrimaryTopicOf | |
is Link from a Wikipage to another Wikipage of | |
is Wikipage disambiguates of | |
is foaf:primaryTopic of |