Line 30 of the Chengdu Metro is a metro line currently under construction in Chengdu. Line 30's color is Light Pink. Phase 1 runs tangentially on the south side of the Chengdu from Terminal 2 of Shuangliu International Airport to . Phase 1 is 27.74 km long with 24 stations, all underground. Line 30 will use 6-car Type-B rolling stock operating up to 80 km/h. Line 30 will be served by two depots at Gaobeiba and Hongjiaqiao.

AttributesValues
rdf:type
rdfs:label
  • Line 30 (Chengdu Metro) (en)
  • 成都地铁30号线 (zh)
rdfs:comment
  • Line 30 of the Chengdu Metro is a metro line currently under construction in Chengdu. Line 30's color is Light Pink. Phase 1 runs tangentially on the south side of the Chengdu from Terminal 2 of Shuangliu International Airport to . Phase 1 is 27.74 km long with 24 stations, all underground. Line 30 will use 6-car Type-B rolling stock operating up to 80 km/h. Line 30 will be served by two depots at Gaobeiba and Hongjiaqiao. (en)
  • 成都地铁30号线位于四川省成都市,为隶属于成都地铁系统的地铁线路,线路代表色为粉色,一期工程西起双流机场2航站楼站,东至龙泉站,线路主要沿双流区大件路、高新区府城大道、锦江区南三环、龙泉驿区陵川路敷设,呈西南东北走向。线路长约27.74km,均为地下线,共设置车站24座,初期换乘站8座。全线设车辆段1座,为;主变电所2座,分别为石羊主变电所和洪家桥主变电所。车辆采用6节编组B型车,GoA4级(无人看守运行)全自动无人驾驶技术,设计时速80km/h。2020年,线路正式开工,计划工期4年,预计2024年建成通车。 (zh)
foaf:name
  • Chengdu Metro Line 30 (en)
name
  • Chengdu Metro Line 30 (en)
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
stations
dbp:wikiPageUsesTemplate
electrification
  • overhead lines, 1,500 V DC (en)
image width
locale
operator
owner
speed
status
  • Construction (en)
system
Tracks
type
has abstract
  • Line 30 of the Chengdu Metro is a metro line currently under construction in Chengdu. Line 30's color is Light Pink. Phase 1 runs tangentially on the south side of the Chengdu from Terminal 2 of Shuangliu International Airport to . Phase 1 is 27.74 km long with 24 stations, all underground. Line 30 will use 6-car Type-B rolling stock operating up to 80 km/h. Line 30 will be served by two depots at Gaobeiba and Hongjiaqiao. (en)
  • 成都地铁30号线位于四川省成都市,为隶属于成都地铁系统的地铁线路,线路代表色为粉色,一期工程西起双流机场2航站楼站,东至龙泉站,线路主要沿双流区大件路、高新区府城大道、锦江区南三环、龙泉驿区陵川路敷设,呈西南东北走向。线路长约27.74km,均为地下线,共设置车站24座,初期换乘站8座。全线设车辆段1座,为;主变电所2座,分别为石羊主变电所和洪家桥主变电所。车辆采用6节编组B型车,GoA4级(无人看守运行)全自动无人驾驶技术,设计时速80km/h。2020年,线路正式开工,计划工期4年,预计2024年建成通车。 (zh)
Character
  • underground and elevated (en)
depot
  • Gaobeiba Depot (en)
  • Hongjiaqiao Depot (en)
planopen
line length (μ)
number of stations
speed limit (kmh)
prov:wasDerivedFrom
page length (characters) of wiki page
status
  • Construction
is part of
operator
type
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 40 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software