Chengdu Metro Line 27 (Chinese: 成都地铁27号线) is a Chengdu Metro line under construction in Chengdu, Sichuan, China. It is a tangential line that runs diagonally from the west to the north of Chengdu. The train uses 6 car B-type trains. Line 27's colour is light blue. In 2019, Aug 21st, the National Development and Reform Commission approved the 4th stage of development plan from Chengdu Rail Transit, which includes Line 27.

AttributesValues
rdfs:label
  • Line 27 (Chengdu Metro) (en)
  • 成都地铁27号线 (zh)
rdfs:comment
  • 成都地铁27号线位于四川省成都市,为隶属于成都地铁系统的地铁线路,线路代表色为浅蓝色,一期工程北起新都区石佛站,西至青羊区蜀鑫路站,串联蓉欧新城、天回镇、凤凰山、沙河源、金府、茶店子、外金沙等7个片区。线路全长24.86km,设车站23座,其中高架线约7.52km,设站6座;地下线约17.34km,设站17座。设大丰车辆基地1座;在大丰、韦家碾设置主变电所2座。控制中心共享线网新苗控制中心。车辆采用6节编组B型列车,GoA4级(无人看守运行)全自动无人驾驶技术,最高时速80km/h。2020年,线路正式开工,计划工期4年,预计2024年建成通车。 (zh)
  • Chengdu Metro Line 27 (Chinese: 成都地铁27号线) is a Chengdu Metro line under construction in Chengdu, Sichuan, China. It is a tangential line that runs diagonally from the west to the north of Chengdu. The train uses 6 car B-type trains. Line 27's colour is light blue. In 2019, Aug 21st, the National Development and Reform Commission approved the 4th stage of development plan from Chengdu Rail Transit, which includes Line 27. (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
has abstract
  • Chengdu Metro Line 27 (Chinese: 成都地铁27号线) is a Chengdu Metro line under construction in Chengdu, Sichuan, China. It is a tangential line that runs diagonally from the west to the north of Chengdu. The train uses 6 car B-type trains. Line 27's colour is light blue. In 2019, Aug 21st, the National Development and Reform Commission approved the 4th stage of development plan from Chengdu Rail Transit, which includes Line 27. The first phase will be from Xindu District Xiangcheng Avenue station to Qingyang District Heyuanmen Gate station. The line is 24.86km long with 23 stations. From the north, the line has a 7.52km long elevated section with 6 stations and followed by a 17.34km underground section with 17 stations. Phase 1 started construction on 2020-5-18 and is planned to open in by 2024. (en)
  • 成都地铁27号线位于四川省成都市,为隶属于成都地铁系统的地铁线路,线路代表色为浅蓝色,一期工程北起新都区石佛站,西至青羊区蜀鑫路站,串联蓉欧新城、天回镇、凤凰山、沙河源、金府、茶店子、外金沙等7个片区。线路全长24.86km,设车站23座,其中高架线约7.52km,设站6座;地下线约17.34km,设站17座。设大丰车辆基地1座;在大丰、韦家碾设置主变电所2座。控制中心共享线网新苗控制中心。车辆采用6节编组B型列车,GoA4级(无人看守运行)全自动无人驾驶技术,最高时速80km/h。2020年,线路正式开工,计划工期4年,预计2024年建成通车。 (zh)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 52 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software