About: Julius Nyerere Hydropower Station     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:ArchitecturalStructure, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FJulius_Nyerere_Hydropower_Station

Julius Nyerere Hydropower Station (JNHS; RHHP; Rufiji Hydroelectric Power Project; Stiegler's Gorge Dam) is a hydroelectric dam under construction across the Rufiji River in eastern Tanzania. Although controversial, the government approved the plans in 2018. The power station is expected to have an installed capacity of 2,115 megawatts (2,836,000 hp) and to produce 5,920GWh of power annually. The project, power station and dam are owned by and will be managed by the government owned Tanzania Electric Supply Company (TANESCO). Construction began in 2019 and is expected to be completed in 2022.

AttributesValues
rdf:type
rdfs:label
  • محطة يوليوس نيريري للطاقة الكهرومائية (ar)
  • Julius Nyerere (Kraftwerk) (de)
  • Barrage Julius Nyerere (fr)
  • Julius Nyerere Hydropower Station (en)
rdfs:comment
  • محطة يوليوس نيريري للطاقة الكهرومائية، وتسمى أيضًا محطة روفيجي للطاقة الكهرومائية قيد الإنشاء في تنزانيا. من المتوقع أن تنتج محطة الطاقة 5920 جيجاوات ساعة من الطاقة سنويًا. (ar)
  • Julius Nyerere ist ein im Bau befindliches Laufwasserkraftwerk am Fluss Rufiji in Tansania. (de)
  • Julius Nyerere Hydropower Station (JNHS; RHHP; Rufiji Hydroelectric Power Project; Stiegler's Gorge Dam) is a hydroelectric dam under construction across the Rufiji River in eastern Tanzania. Although controversial, the government approved the plans in 2018. The power station is expected to have an installed capacity of 2,115 megawatts (2,836,000 hp) and to produce 5,920GWh of power annually. The project, power station and dam are owned by and will be managed by the government owned Tanzania Electric Supply Company (TANESCO). Construction began in 2019 and is expected to be completed in 2022. (en)
  • Le barrage Julius Nyerere, anciennement barrage de Rufiji ou barrage de Stiegler's Gorge est un barrage hydroélectrique en construction sur le fleuve Rufiji, en Tanzanie. Avec une puissance installée de 2 115 MW, il sera à sa mise en service en 2022 l'un des plus importants d'Afrique. De par son coût très élevé et son fort impact environnemental, ce projet est extrêmement controversé. Il est nommé en hommage à Julius Nyerere, président de la Tanzanie de 1964 à 1985. (fr)
foaf:name
  • Julius Nyerere Hydropower Station (en)
foaf:homepage
name
  • Julius Nyerere Hydropower Station (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 50 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software