Illinois Route 255 (IL 255), also referred to as the Alton Bypass, is a northwesterly extension of Interstate 255 (I-255) in southwestern Illinois in the St. Louis metropolitan area. IL 255 starts at I-270 in Pontoon Beach and ends at U.S. Route 67 (US 67) in Godfrey, at a total length of approximately 23.3 miles (37.5 km). It was constructed in four segments opening from 1998 to 2012 at a total cost of $165.2 million.