Holaniku at Keahole Point is a 2MW micro-scaled concentrated solar power plant in the Kona District (west coast) of the island of Hawaiʻi. It is located in the Natural Energy Laboratory of Hawaii at Keahole Point.

AttributesValues
rdf:type
rdfs:label
  • Holaniku at Keahole Point (en)
rdfs:comment
  • Holaniku at Keahole Point is a 2MW micro-scaled concentrated solar power plant in the Kona District (west coast) of the island of Hawaiʻi. It is located in the Natural Energy Laboratory of Hawaii at Keahole Point. (en)
foaf:name
  • Holaniku at Keahole Point (en)
name
  • Holaniku at Keahole Point (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
solar csp technology
  • P (en)
solar type
  • CSP (en)
dbp:wikiPageUsesTemplate
country
  • United States (en)
date
  • June 2016 (en)
location
owner
  • Keahole Solar Power (en)
reason
  • domain on WP:BLACKLIST (en)
status
  • O (en)
commissioned
georss:point
  • 19.715 -156.03527777777776
has abstract
  • Holaniku at Keahole Point is a 2MW micro-scaled concentrated solar power plant in the Kona District (west coast) of the island of Hawaiʻi. It is located in the Natural Energy Laboratory of Hawaii at Keahole Point. Holaniku at Keahole Point is the first commercial solar thermal power plant to be built using solar collectors manufactured by Sopogy. The project was developed by Keahole Solar Power, LLC. an Engineering, Procurement, and Contracting company. The plant contains over 1,000 Sopogy MicroCSP SopoNova parabolic trough solar collectors. The power plant uses the sun's heat to create steam. Most of the steam created is used onsite for other experimental uses, equating to only 0.5MW maximum that can be utilized to generate electricity. Little, if any, electrical power leaves the site and enters the state electrical grid. (en)
construction began
ps electrical cap fac
ps electrical capacity
ps units operational
building start year
capacity factor
prov:wasDerivedFrom
page length (characters) of wiki page
opening date
opening year
status
  • O
installed capacity (W)
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-156.03527832031 19.715000152588)
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 67 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software