The Heimifeng Pumped Storage Power Station (Chinese: 黑麋峰抽水蓄能电站) is located at the hills of Heimifeng, Qiaoyi town, Wangcheng district, 25 kilometres (16 mi) north of Changsha in Hunan province, China. It was constructed between 2005 and 2009 with the generators being commissioned in 2009 and 2010. The station generates power by transferring water between an upper and lower reservoir. When energy demand is high, water from the upper reservoir is released and used to generate electricity before being discharged into the lower reservoir. During times of low demand, water from the lower reservoir is then pumped back up to replenish upper reservoir. This process allows the station to meet peak energy demand and it can go from standstill to operational in three minutes.

AttributesValues
rdf:type
rdfs:label
  • Heimifeng Pumped Storage Power Station (en)
  • ГАЕС Hēimífēng (uk)
  • 黑麋峰抽水蓄能电站 (zh)
rdfs:comment
  • 黑麋峰抽水蓄能电站位于湖南省长沙市望城区桥驿镇,为湖南省第一座抽水蓄能电站。总装机容量120万千瓦,分二期实施。设计安装4台单机30万千瓦单级单转速立轴混流可逆式蓄能机组,电站额定水头295米,设计年发峰荷电量16.06亿千瓦时,年抽水耗用低谷电量21.41亿千瓦时。一期工程2台发电机组,动态投资35亿元,主体工程2005年5月开工,2009年5月完成充水试验,2009年8月23日首台机正式试运行。第二期工程已于2010年7月获得批准,总工期约27个月,工程总投资约14.2亿元。 (zh)
  • The Heimifeng Pumped Storage Power Station (Chinese: 黑麋峰抽水蓄能电站) is located at the hills of Heimifeng, Qiaoyi town, Wangcheng district, 25 kilometres (16 mi) north of Changsha in Hunan province, China. It was constructed between 2005 and 2009 with the generators being commissioned in 2009 and 2010. The station generates power by transferring water between an upper and lower reservoir. When energy demand is high, water from the upper reservoir is released and used to generate electricity before being discharged into the lower reservoir. During times of low demand, water from the lower reservoir is then pumped back up to replenish upper reservoir. This process allows the station to meet peak energy demand and it can go from standstill to operational in three minutes. (en)
  • ГАЕС Hēimífēng (黑麋峰抽水蓄能电站) — гідроакумулювальна електростанція в центральній частині Китаю у провінції Хунань. Обидва резервуари станції створили на лівобережжі річки Шахе, правої притоки Сянцзян, яка впадає до розташованого на правобережжі Янцзи великого озера Дунтін. Верхню водойму з об'ємом 9,2 млн м3 (корисний об'єм 8,5 млн м3) та нормальним рівнем поверхні на позначці 400 метрів НРМ утримують дві кам'яно-накидні споруди із бетонним облицюванням висотою 70 метрів та 60 метрів. Розташовану від неї за 1 км нижню водойму створили за допомогою так само кам'яно-накидної греблі із бетонним облицюванням висотою 80 метрів. Вона має об'єм 9,6 млн м3 (корисний об'єм 8,9 млн м3) та нормальний рівень поверхні на позначці 104 метри НРМ. (uk)
foaf:name
  • Heimifeng Pumped Storage Power Station (en)
name
  • Heimifeng Pumped Storage Power Station (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
country
  • China (en)
location
opening
owner
status
  • O (en)
georss:point
  • 28.459722222222222 113.01
has abstract
  • The Heimifeng Pumped Storage Power Station (Chinese: 黑麋峰抽水蓄能电站) is located at the hills of Heimifeng, Qiaoyi town, Wangcheng district, 25 kilometres (16 mi) north of Changsha in Hunan province, China. It was constructed between 2005 and 2009 with the generators being commissioned in 2009 and 2010. The station generates power by transferring water between an upper and lower reservoir. When energy demand is high, water from the upper reservoir is released and used to generate electricity before being discharged into the lower reservoir. During times of low demand, water from the lower reservoir is then pumped back up to replenish upper reservoir. This process allows the station to meet peak energy demand and it can go from standstill to operational in three minutes. The upper reservoir is located at an elevation of 400 metres (1,300 ft) formed by two main dams and two auxiliary dams. The main dams are 69.5 metres (228 ft) and 59.5 metres (195 ft) high concrete-face rock-fill dams (CFRD). Helping to support the reservoir is an additional 39.5 metres (130 ft) CFRD and a 19.5 metres (64 ft) tall gravity dam. The upper reservoir has a storage capacity of 9,965,000 cubic metres (8,079 acre⋅ft). The lower reservoir sits at an elevation of 103.7 metres (340 ft) and is 1 kilometre (0.62 mi) north of the lower reservoir. It is created by a 79.5 metres (261 ft) tall rock-fill dam which withholds a reservoir of 9,593,000 cubic metres (7,777 acre⋅ft). Located in the underground power station is four 300 megawatts (400,000 hp) reversible Francis pump turbines. The difference in elevation between the two reservoirs affords a hydraulic head of 295 metres (968 ft). The station generates 1.606 billion kWh annually and consumes 2.16 billion kWh in pumping mode. The plant is profitable because pumping occurs during low demand periods when electricity is cheap. (en)
  • ГАЕС Hēimífēng (黑麋峰抽水蓄能电站) — гідроакумулювальна електростанція в центральній частині Китаю у провінції Хунань. Обидва резервуари станції створили на лівобережжі річки Шахе, правої притоки Сянцзян, яка впадає до розташованого на правобережжі Янцзи великого озера Дунтін. Верхню водойму з об'ємом 9,2 млн м3 (корисний об'єм 8,5 млн м3) та нормальним рівнем поверхні на позначці 400 метрів НРМ утримують дві кам'яно-накидні споруди із бетонним облицюванням висотою 70 метрів та 60 метрів. Розташовану від неї за 1 км нижню водойму створили за допомогою так само кам'яно-накидної греблі із бетонним облицюванням висотою 80 метрів. Вона має об'єм 9,6 млн м3 (корисний об'єм 8,9 млн м3) та нормальний рівень поверхні на позначці 104 метри НРМ. Резервуари за допомогою тунелів з'єднані із розташованим між ними підземним машинним залом, де встановлено чотири оборотні турбіни типу Френсіс потужністю по 300 МВт. Вони використовують напір у 295 метрів та розраховані на виробництво 1606 млн кВт·год електроенергії на рік при споживанні 2141 млн кВт·год. (uk)
  • 黑麋峰抽水蓄能电站位于湖南省长沙市望城区桥驿镇,为湖南省第一座抽水蓄能电站。总装机容量120万千瓦,分二期实施。设计安装4台单机30万千瓦单级单转速立轴混流可逆式蓄能机组,电站额定水头295米,设计年发峰荷电量16.06亿千瓦时,年抽水耗用低谷电量21.41亿千瓦时。一期工程2台发电机组,动态投资35亿元,主体工程2005年5月开工,2009年5月完成充水试验,2009年8月23日首台机正式试运行。第二期工程已于2010年7月获得批准,总工期约27个月,工程总投资约14.2亿元。 (zh)
construction began
plant turbines
vastest lake
part
building start year
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • 2005
opening year
status
  • O
owner
foaf:isPrimaryTopicOf
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 49 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software