Haggerston Baths in Hackney, London, was opened in 1904 as public baths. The baths were built at a cost of £60,000. There was a single pool, 91 slipper baths and a 60 stall wash house. The Grade II listed Haggerston Pool was designed by Alfred Cross. It was closed in 2000 with an uncertain future. In June 2009 after a long community campaign, a £5m grant was announced from the Department for Children, Schools and Families to refurbish and re-open the pool. The building would also contain community facilities and a GP surgery. Heavily involved in the re-opening of the pool was Michael Gallie, who was instrumental in surveying the building, creating 3D model sketches and more.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| |
rdfs:comment
| - Haggerston Baths in Hackney, London, was opened in 1904 as public baths. The baths were built at a cost of £60,000. There was a single pool, 91 slipper baths and a 60 stall wash house. The Grade II listed Haggerston Pool was designed by Alfred Cross. It was closed in 2000 with an uncertain future. In June 2009 after a long community campaign, a £5m grant was announced from the Department for Children, Schools and Families to refurbish and re-open the pool. The building would also contain community facilities and a GP surgery. Heavily involved in the re-opening of the pool was Michael Gallie, who was instrumental in surveying the building, creating 3D model sketches and more. (en)
|
name
| |
geo:lat
| |
geo:long
| |
foaf:depiction
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
address
| - Whiston Road, Hackney, London (en)
|
architect
| |
caption
| |
Closed
| |
opened
| |
postcode
| |
status
| |
georss:point
| |
has abstract
| - Haggerston Baths in Hackney, London, was opened in 1904 as public baths. The baths were built at a cost of £60,000. There was a single pool, 91 slipper baths and a 60 stall wash house. The Grade II listed Haggerston Pool was designed by Alfred Cross. It was closed in 2000 with an uncertain future. In June 2009 after a long community campaign, a £5m grant was announced from the Department for Children, Schools and Families to refurbish and re-open the pool. The building would also contain community facilities and a GP surgery. Heavily involved in the re-opening of the pool was Michael Gallie, who was instrumental in surveying the building, creating 3D model sketches and more. Due to the financial downturn the council has had to remove funding for the re-opening of the baths. The Haggerston baths campaign has restarted efforts to find financial backing and public support in an effort to re-open the pool. (en)
|
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(-0.071227997541428 51.535236358643)
|
is Link from a Wikipage to another Wikipage
of | |
is foaf:primaryTopic
of | |