General Asım Gündüz is a proposed underground station on the Üçyol–Çamlıkule Line of the İzmir Metro. It will be located beneath Halide Edip Adıvar Boulevard, next to Mahmut Yaşar Bostancı Park, in southern Konak. Construction of the station, along with the metro line, is expected to begin in 2020. West of the station, the line will split and loop around to Üçyol. The northern part of the loop will stop at Zafertepe, while the southern part will stop at Bozyaka. The two section will meet at Üçyol. General Asım Gündüz station is expected to open in 2024.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - General Asım Gündüz (İzmir Metro) (en)
|
rdfs:comment
| - General Asım Gündüz is a proposed underground station on the Üçyol–Çamlıkule Line of the İzmir Metro. It will be located beneath Halide Edip Adıvar Boulevard, next to Mahmut Yaşar Bostancı Park, in southern Konak. Construction of the station, along with the metro line, is expected to begin in 2020. West of the station, the line will split and loop around to Üçyol. The northern part of the loop will stop at Zafertepe, while the southern part will stop at Bozyaka. The two section will meet at Üçyol. General Asım Gündüz station is expected to open in 2024. (en)
|
foaf:name
| |
name
| |
geo:lat
| |
geo:long
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
address
| - Halide Edip Adıvar Cd., Güneşli Mah., 35110 (en)
|
borough
| |
disabled
| |
operator
| |
owned
| |
style
| |
Tracks
| |
type
| - İzmir Metro rapid transit station (en)
|
georss:point
| |
has abstract
| - General Asım Gündüz is a proposed underground station on the Üçyol–Çamlıkule Line of the İzmir Metro. It will be located beneath Halide Edip Adıvar Boulevard, next to Mahmut Yaşar Bostancı Park, in southern Konak. Construction of the station, along with the metro line, is expected to begin in 2020. West of the station, the line will split and loop around to Üçyol. The northern part of the loop will stop at Zafertepe, while the southern part will stop at Bozyaka. The two section will meet at Üçyol. General Asım Gündüz station is expected to open in 2024. (en)
|
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
address
| - Halide Edip Adıvar Cd., Güneşli Mah., 35110 (en)
|
number of tracks
| |
opening year
| |
owner
| |
owning organisation
| |
type
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(27.133136749268 38.396224975586)
|
is Link from a Wikipage to another Wikipage
of | |
is foaf:primaryTopic
of | |