The Fengning Pumped Storage Power Station is a pumped-storage hydroelectric power station about 145 km (90 mi) northwest of Chengde in Fengning Manchu Autonomous County of Hebei Province, China. Construction on the power station began in June 2013 and the first generator was commissioned in 2019, the last in 2021. Project cost was US$1.87 billion. On 1 April 2014 Gezhouba Group was awarded the main contract to build the power station. It will be constructed in two 1,800 MW phases. It was completed in late 2021, and became the largest pumped-storage power station in the world with an installed capacity of 3,600 MW.

AttributesValues
rdf:type
rdfs:label
  • Fengning Pumped Storage Power Station (en)
  • Pumpspeicherkraftwerk Fengning (de)
rdfs:comment
  • Das Pumpspeicherkraftwerk Fengning ist ein derzeit im Bau befindliches Pumpspeicherkraftwerk in der Provinz Hebei, China. Mit der Errichtung des Kraftwerks wurde im Mai 2013 begonnen. Das Kraftwerk soll in zwei Phasen errichtet werden und soll laut Plan 2021 fertiggestellt sein.[veraltet] (de)
  • The Fengning Pumped Storage Power Station is a pumped-storage hydroelectric power station about 145 km (90 mi) northwest of Chengde in Fengning Manchu Autonomous County of Hebei Province, China. Construction on the power station began in June 2013 and the first generator was commissioned in 2019, the last in 2021. Project cost was US$1.87 billion. On 1 April 2014 Gezhouba Group was awarded the main contract to build the power station. It will be constructed in two 1,800 MW phases. It was completed in late 2021, and became the largest pumped-storage power station in the world with an installed capacity of 3,600 MW. (en)
foaf:name
  • Fengning Pumped Storage Power Station (en)
name
  • Fengning Pumped Storage Power Station (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
cost
country
  • China (en)
location
opening
status
  • O (en)
georss:point
  • 41.66620833333333 116.52878611111112
has abstract
  • Das Pumpspeicherkraftwerk Fengning ist ein derzeit im Bau befindliches Pumpspeicherkraftwerk in der Provinz Hebei, China. Mit der Errichtung des Kraftwerks wurde im Mai 2013 begonnen. Das Kraftwerk soll in zwei Phasen errichtet werden und soll laut Plan 2021 fertiggestellt sein.[veraltet] (de)
  • The Fengning Pumped Storage Power Station is a pumped-storage hydroelectric power station about 145 km (90 mi) northwest of Chengde in Fengning Manchu Autonomous County of Hebei Province, China. Construction on the power station began in June 2013 and the first generator was commissioned in 2019, the last in 2021. Project cost was US$1.87 billion. On 1 April 2014 Gezhouba Group was awarded the main contract to build the power station. It will be constructed in two 1,800 MW phases. It was completed in late 2021, and became the largest pumped-storage power station in the world with an installed capacity of 3,600 MW. The lower reservoir will hold up to 66,150,000 m3 (53,630 acre⋅ft) of water of which 41,480,000 m3 (33,630 acre⋅ft) can be used for power generation. The upper reservoir will withhold up to 48,830,000 m3 (39,590 acre⋅ft) of water of which 40,610,000 m3 (32,920 acre⋅ft) can be used for power generation. Water from the upper reservoir is sent to the underground power station down near the lower reservoir. (en)
construction began
lower res name
  • Fengning Lower (en)
plant annual gen
plant capacity
plant hydraulic head
  • 425 m (en)
plant pumpgenerators
  • Francis pump turbines (en)
  • Phase 1: 6 x 300 MW (en)
  • Phase 2: 6 x 300 MW (en)
plant storage hours
res name
  • Fengning Upper (en)
vastest lake
part
gold:hypernym
building start year
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • 2013
opening year
status
  • O
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(116.52878570557 41.666210174561)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 49 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software