The Dunhuang railway (simplified Chinese: 敦煌铁路; traditional Chinese: 敦煌鐵路; pinyin: Dūnhuáng Tiělù) is a branch of the Lanzhou–Xinjiang railway in Gansu Province, China. It runs 169 kilometres (105 mi) from in Guazhou County, on the main line, to the terminus at Dunhuang railway station. Construction, at a cost of 640 million yuan, started on 7 September 2004. The first service to Dunhuang ran on 3 March 2006.
Attributes | Values |
---|
rdfs:label
| - Dunhuang railway (en)
- 敦煌線 (ja)
- 敦煌铁路 (zh)
|
rdfs:comment
| - The Dunhuang railway (simplified Chinese: 敦煌铁路; traditional Chinese: 敦煌鐵路; pinyin: Dūnhuáng Tiělù) is a branch of the Lanzhou–Xinjiang railway in Gansu Province, China. It runs 169 kilometres (105 mi) from in Guazhou County, on the main line, to the terminus at Dunhuang railway station. Construction, at a cost of 640 million yuan, started on 7 September 2004. The first service to Dunhuang ran on 3 March 2006. (en)
- 敦煌線(とんこうせん、中文表記: 敦煌铁路、英文表記: Dunhuang Railway)は、中国甘粛省酒泉市の柳溝駅と敦煌駅とを結ぶ鉄道路線である。 (ja)
- 敦煌铁路,是位于甘肃省西部酒泉市境内的一条铁路。线路起点为兰新铁路柳沟站,终点为敦煌站。线路全长约170公里。全线共设有车站5座。2004年9月7日全线开工建设,建设工期2年,总投资为人民币6.4亿元。2006年8月5日开通營運。敦煌铁路电气化改造工程自2014年4月开工,2015年11月8日,铁路电气化改造项目水库北、龙口坝、四工农场、芦草河、伊塘湖等五座新建车站开通运营,2015年12月28日电气化改造工程竣工,2016年4月17日具备开通运营条件。 于2016年4月27日正式开通运营。敦煌线于2019年6月30日完成提速改造工程,同年7月10日起开行动车组列车。 (zh)
|
dct:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
p
| |
s
| |
t
| |
has abstract
| - The Dunhuang railway (simplified Chinese: 敦煌铁路; traditional Chinese: 敦煌鐵路; pinyin: Dūnhuáng Tiělù) is a branch of the Lanzhou–Xinjiang railway in Gansu Province, China. It runs 169 kilometres (105 mi) from in Guazhou County, on the main line, to the terminus at Dunhuang railway station. Construction, at a cost of 640 million yuan, started on 7 September 2004. The first service to Dunhuang ran on 3 March 2006. (en)
- 敦煌線(とんこうせん、中文表記: 敦煌铁路、英文表記: Dunhuang Railway)は、中国甘粛省酒泉市の柳溝駅と敦煌駅とを結ぶ鉄道路線である。 (ja)
- 敦煌铁路,是位于甘肃省西部酒泉市境内的一条铁路。线路起点为兰新铁路柳沟站,终点为敦煌站。线路全长约170公里。全线共设有车站5座。2004年9月7日全线开工建设,建设工期2年,总投资为人民币6.4亿元。2006年8月5日开通營運。敦煌铁路电气化改造工程自2014年4月开工,2015年11月8日,铁路电气化改造项目水库北、龙口坝、四工农场、芦草河、伊塘湖等五座新建车站开通运营,2015年12月28日电气化改造工程竣工,2016年4月17日具备开通运营条件。 于2016年4月27日正式开通运营。敦煌线于2019年6月30日完成提速改造工程,同年7月10日起开行动车组列车。 (zh)
|
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
is Link from a Wikipage to another Wikipage
of | |
is Wikipage redirect
of | |
is foaf:primaryTopic
of | |