The Don River Bridge is a reinforced concrete road bridge that carries the Leichhardt Highway across the Don River, located near Rannes, Queensland, Australia. The former low-level timber bridge was prone to flooding. Three new concrete bridges are planned on a new and improved alignment of a 13 kilometres (8.1 mi) section of the Leichhardt Highway over the Don River, Windmill Creek and Log Creek as part of the A$65 million Don River Bridges Project. When completed the higher bridges will improve flood immunity of this rural highway.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Don River Bridge, Rannes (en)
|
rdfs:comment
| - The Don River Bridge is a reinforced concrete road bridge that carries the Leichhardt Highway across the Don River, located near Rannes, Queensland, Australia. The former low-level timber bridge was prone to flooding. Three new concrete bridges are planned on a new and improved alignment of a 13 kilometres (8.1 mi) section of the Leichhardt Highway over the Don River, Windmill Creek and Log Creek as part of the A$65 million Don River Bridges Project. When completed the higher bridges will improve flood immunity of this rural highway. (en)
|
foaf:name
| |
geo:lat
| |
geo:long
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
begin
| - expected end of 2011 (en)
|
complete
| |
bridge name
| |
carries
| |
crosses
| |
date
| |
locale
| - Rannes, Queensland, Australia (en)
|
material
| |
native name lang
| |
reason
| - Need to know if this bridge has been built and when (en)
|
replaces
| - Low-level timber bridge (en)
|
georss:point
| |
has abstract
| - The Don River Bridge is a reinforced concrete road bridge that carries the Leichhardt Highway across the Don River, located near Rannes, Queensland, Australia. The former low-level timber bridge was prone to flooding. Three new concrete bridges are planned on a new and improved alignment of a 13 kilometres (8.1 mi) section of the Leichhardt Highway over the Don River, Windmill Creek and Log Creek as part of the A$65 million Don River Bridges Project. When completed the higher bridges will improve flood immunity of this rural highway. Construction of the new bridges is expected to start by the end of 2011 and be completed in mid-2013. (en)
|
construction material
| |
gold:hypernym
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
bridge carries
| |
building end date
| |
building start date
| |
crosses
| |
located in area
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(150.11929321289 -24.095600128174)
|
is Link from a Wikipage to another Wikipage
of | |
is foaf:primaryTopic
of | |