Denis-Perron dam (French: Barrage Denis-Perron) is a rockfill embankment dam spanning the Sainte-Marguerite River, a tributary of the lower Saint Lawrence River, in eastern Quebec, Canada. Standing 171 metres (561 ft) high and 378 metres (1,240 ft) long, the dam is the primary component of Hydro-Québec's Sainte-Marguerite 3 hydroelectric project. The dam is the second highest in Quebec and the hydraulic head afforded to its power plant is also the largest in the province.

AttributesValues
rdf:type
rdfs:label
  • Denis-Perron dam (en)
  • Barrage Denis-Perron (sv)
rdfs:comment
  • Denis-Perron dam (French: Barrage Denis-Perron) is a rockfill embankment dam spanning the Sainte-Marguerite River, a tributary of the lower Saint Lawrence River, in eastern Quebec, Canada. Standing 171 metres (561 ft) high and 378 metres (1,240 ft) long, the dam is the primary component of Hydro-Québec's Sainte-Marguerite 3 hydroelectric project. The dam is the second highest in Quebec and the hydraulic head afforded to its power plant is also the largest in the province. (en)
  • Barrage Denis-Perron är en dammbyggnad i Kanada. Den ligger i countyt Côte-Nord och provinsen Québec, i den östra delen av landet, 900 km nordost om huvudstaden Ottawa. Barrage Denis-Perron ligger 386 meter över havet. Terrängen runt Barrage Denis-Perron är huvudsakligen lite kuperad. Barrage Denis-Perron ligger nere i en dal som går i nord-sydlig riktning. Den högsta punkten i närheten är 580 meter över havet, 1,0 km öster om Barrage Denis-Perron. Trakten runt Barrage Denis-Perron är nära nog obefolkad, med mindre än två invånare per kvadratkilometer.. Det finns inga samhällen i närheten. (sv)
foaf:name
  • Denis-Perron dam (en)
name
  • Denis-Perron dam (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
cost
  • CA$ 2.4 billion (en)
country
location
location map
  • Quebec (en)
opening
owner
georss:point
  • 50.790277777777774 -66.79194444444444
has abstract
  • Denis-Perron dam (French: Barrage Denis-Perron) is a rockfill embankment dam spanning the Sainte-Marguerite River, a tributary of the lower Saint Lawrence River, in eastern Quebec, Canada. Standing 171 metres (561 ft) high and 378 metres (1,240 ft) long, the dam is the primary component of Hydro-Québec's Sainte-Marguerite 3 hydroelectric project. The dam is the second highest in Quebec and the hydraulic head afforded to its power plant is also the largest in the province. Construction on the dam began in 1994 after seven years of studies and planning. Before construction began on the dam proper, a 19-metre (62 ft) high, 160-metre (520 ft) long cofferdam was raised to divert the river through a tunnel west of the dam site. An average of 500 workers and a maximum of 1,200, most of whom lived in a construction camp that opened in January 1995, were employed at the dam site during construction. After the cutting of some 233 million board feet of lumber from the future reservoir site, the dam began to impound water in 1998 and finally reached capacity in 2001. The dam and reservoir lie in a very remote region, and an 86-kilometre (53 mi) long access road had to be built to facilitate transportation to the construction site. No area residents were displaced as a result of the remote location, but a large portion of the territory of the indigenous Innu people was flooded. In 1994, Hydro-Québec paid the local Innu CA$20.9 million as compensation. Full project completion was reached in 2002 at a cost of CA$2.4 billion, making it one of the most significant 21st century hydroelectric developments in North America. After the dam was finished, temporary facilities used during construction were dismantled to ease impact on the local environment. The main workers' camp was actually demolished in 2001, a year before the project's final completion. These areas were replanted with some six hundred thousand trees. Hydroelectricity generation began in 2003. As of 2003, the dam was projected to generate about 2.73 TWh of electricity per year, or an average output of just over 310 megawatts (MW). The dam impounds a 140 km (87 mi) long, 253 km2 (63,000-acre) reservoir with a capacity of about 12.5 km3 (10,100,000 acre⋅ft). Excess water is released through a set of outlet works at the base of the dam, with a capacity of 1,440 m3/s (51,000 cu ft/s), and an emergency spillway about 1 km (0.62 mi) northwest of the dam. The spillway's three gates have a total capacity of 1,875 m3/s (66,200 cu ft/s), and its outflow rejoins the river about 1 km (0.62 mi) below the base of the dam. Water is fed from the reservoir through an 8.3 km (5.2 mi) long penstock to the Sainte-Marguerite 3 generating plant, which is located underground and can produce up to 882 MW from two turbines. Hydro-Québec is in the process of adding a third unit, bringing the total generating capacity to 1,322 MW, scheduled for completion in 2014. (en)
  • Barrage Denis-Perron är en dammbyggnad i Kanada. Den ligger i countyt Côte-Nord och provinsen Québec, i den östra delen av landet, 900 km nordost om huvudstaden Ottawa. Barrage Denis-Perron ligger 386 meter över havet. Terrängen runt Barrage Denis-Perron är huvudsakligen lite kuperad. Barrage Denis-Perron ligger nere i en dal som går i nord-sydlig riktning. Den högsta punkten i närheten är 580 meter över havet, 1,0 km öster om Barrage Denis-Perron. Trakten runt Barrage Denis-Perron är nära nog obefolkad, med mindre än två invånare per kvadratkilometer.. Det finns inga samhällen i närheten. I omgivningarna runt Barrage Denis-Perron växer i huvudsak barrskog. Trakten ingår i den boreala klimatzonen. Årsmedeltemperaturen i trakten är −2 °C. Den varmaste månaden är juli, då medeltemperaturen är 14 °C, och den kallaste är januari, med −20 °C. (sv)
construction began
plant capacity
plant commission
plant name
  • Sainte-Marguerite 3 Generating Station (en)
plant turbines
res name
  • Sainte-Marguerite 3 Reservoir (en)
vastest lake
part
building start year
prov:wasDerivedFrom
length (km)
page length (characters) of wiki page
building start date
  • 1994
height (μ)
length (μ)
opening year
volume (μ³)
country
owner
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-66.791946411133 50.790279388428)
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 67 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software