Deg outfall hydro power project is located on the Upper Chenab Canal near Rachna industrial area Sheikhupura, Pujnab in Pakistan. The plant capacity is 4.04 Megawatts (MW). Its construction is funded by the Asian Development Bank. Construction of an approximately 5.2-metre (17 ft) long and 3.7 m (12 ft) wide access road also part of this project which will connect the plant location with the . 56.46 acres of land was acquired for this project in 2013.
Attributes | Values |
---|---|
rdf:type | |
rdfs:label |
|
rdfs:comment |
|
foaf:name |
|
name |
|
geo:lat |
|
geo:long |
|
location | |
dcterms:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage |
|
sameAs | |
dbp:wikiPageUsesTemplate | |
location |
|
owner | |
status |
|
georss:point |
|
has abstract |
|
construction began |
|
dam crosses |
|
dam type | |
name official |
|
plant capacity |
|
plant name |
|
plant operator | |
part | |
river | |
building start year |
|
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
building start date |
|
description |
|
status |
|
owner | |
foaf:isPrimaryTopicOf | |
geo:geometry |
|
is foaf:primaryTopic of |