The Dabhol – Bangalore Natural Gas Pipeline is a natural gas pipeline running from Dabhol, Maharashtra to Bangalore, Karnataka. It was commissioned on 3 December 2013 during the inaugural ceremony of the 8th (AGPS). This project connected South India to the national gas grid for the first time. The project was constructed in a period of 19 months at an investment of ₹45 billion (US$560 million) with a design capacity of 16 million cubic metre per day at standard conditions of natural gas which can produce 3,000 MW of electric power.
Attributes | Values |
---|
rdfs:label
| - Dabhol–Bangalore Natural Gas Pipeline (en)
|
rdfs:comment
| - The Dabhol – Bangalore Natural Gas Pipeline is a natural gas pipeline running from Dabhol, Maharashtra to Bangalore, Karnataka. It was commissioned on 3 December 2013 during the inaugural ceremony of the 8th (AGPS). This project connected South India to the national gas grid for the first time. The project was constructed in a period of 19 months at an investment of ₹45 billion (US$560 million) with a design capacity of 16 million cubic metre per day at standard conditions of natural gas which can produce 3,000 MW of electric power. (en)
|
foaf:homepage
| |
name
| - ದಾಬೊಲ್-ಬೆಂಗಳೂರು ನೆಚುರಲ ಗ್ಯಾಸ್ ಪೈಪ್ಲೈನ್ (en)
- Dabhol-Bangalore Natural Gas Pipeline (en)
- दाभोळ-बंगलौर नेचुरल गैस पाईपलाइन (en)
|
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
through
| - Belgaum, Dharwad, Gadag, Bellary, Davanagere, Chitradurga, Tumkur, Ramanagaram, Bengaluru Rural and Bengaluru Urban districts. (en)
|
dbp:wikiPageUsesTemplate
| |
construction
| |
country
| |
direction
| |
length
| |
length mi
| |
operator
| |
owner
| |
start
| |
state
| - Maharashtra and Karnataka (en)
|
type
| |
finish
| |
par
| |
has abstract
| - The Dabhol – Bangalore Natural Gas Pipeline is a natural gas pipeline running from Dabhol, Maharashtra to Bangalore, Karnataka. It was commissioned on 3 December 2013 during the inaugural ceremony of the 8th (AGPS). This project connected South India to the national gas grid for the first time. The project was constructed in a period of 19 months at an investment of ₹45 billion (US$560 million) with a design capacity of 16 million cubic metre per day at standard conditions of natural gas which can produce 3,000 MW of electric power. (en)
|
contractors
| |
discharge
| |
est
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
is Link from a Wikipage to another Wikipage
of | |
is Wikipage redirect
of | |
is foaf:primaryTopic
of | |