About: Corvallis to the Sea Trail     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : owl:Thing, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FCorvallis_to_the_Sea_Trail

Corvallis to the Sea Trail is a 62-mile (100 km) long hiking, bicycling, and equestrian trail in Western Oregon (United States) which links the Willamette Valley to the Pacific Ocean. It connects between Corvallis and Ona Beach. As of May 2019, the eastern half (about 30 miles) is open and crosses a patchwork of public and private land. The remainder of the trail traverses Siuslaw National Forest with 6 miles (9.7 km) requiring trail to be built. The trail was set to open on June 6, 2020, but is delayed by the COVID-19 pandemic.

AttributesValues
rdfs:label
  • Corvallis to the Sea Trail (en)
rdfs:comment
  • Corvallis to the Sea Trail is a 62-mile (100 km) long hiking, bicycling, and equestrian trail in Western Oregon (United States) which links the Willamette Valley to the Pacific Ocean. It connects between Corvallis and Ona Beach. As of May 2019, the eastern half (about 30 miles) is open and crosses a patchwork of public and private land. The remainder of the trail traverses Siuslaw National Forest with 6 miles (9.7 km) requiring trail to be built. The trail was set to open on June 6, 2020, but is delayed by the COVID-19 pandemic. (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
has abstract
  • Corvallis to the Sea Trail is a 62-mile (100 km) long hiking, bicycling, and equestrian trail in Western Oregon (United States) which links the Willamette Valley to the Pacific Ocean. It connects between Corvallis and Ona Beach. As of May 2019, the eastern half (about 30 miles) is open and crosses a patchwork of public and private land. The remainder of the trail traverses Siuslaw National Forest with 6 miles (9.7 km) requiring trail to be built. The trail was set to open on June 6, 2020, but is delayed by the COVID-19 pandemic. The project to establish the trail had more than 40,000 volunteer hours and $20,000 in donations. The effort began in 1974 but failed due to private property permission difficulties. In 2004, the C2C partnership was created and it proved able to work successfully with Siuslaw National Forest officials. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 67 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software