Coronation Drive, popularly known as Coro Drive, is a road in Brisbane, Queensland which connects the Central Business District to the suburb of Toowong. It follows the Brisbane River from the Riverside Expressway, through the suburbs of Milton and Auchenflower, until it terminates in Toowong at Benson Road and High Street. Coronation Drive is six lanes wide for the majority of its length, with the Bicentennial Bike Path also for pedestrian and bicycle traffic. The road is one of the busiest in Brisbane, carrying an average of 75,560 vehicles per day between July and December 2014.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| |
rdfs:comment
| - Coronation Drive, popularly known as Coro Drive, is a road in Brisbane, Queensland which connects the Central Business District to the suburb of Toowong. It follows the Brisbane River from the Riverside Expressway, through the suburbs of Milton and Auchenflower, until it terminates in Toowong at Benson Road and High Street. Coronation Drive is six lanes wide for the majority of its length, with the Bicentennial Bike Path also for pedestrian and bicycle traffic. The road is one of the busiest in Brisbane, carrying an average of 75,560 vehicles per day between July and December 2014. (en)
|
foaf:name
| |
foaf:depiction
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
through
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
caption
| - Coronation Drive and Brisbane CBD viewed from Toowong Village in November 2019 (en)
|
direction a
| |
direction b
| |
length
| |
route
| |
state
| |
type
| |
has abstract
| - Coronation Drive, popularly known as Coro Drive, is a road in Brisbane, Queensland which connects the Central Business District to the suburb of Toowong. It follows the Brisbane River from the Riverside Expressway, through the suburbs of Milton and Auchenflower, until it terminates in Toowong at Benson Road and High Street. Coronation Drive is six lanes wide for the majority of its length, with the Bicentennial Bike Path also for pedestrian and bicycle traffic. The road is one of the busiest in Brisbane, carrying an average of 75,560 vehicles per day between July and December 2014. (en)
|
end a
| |
end b
| |
road name
| |
prov:wasDerivedFrom
| |
length (km)
| |
page length (characters) of wiki page
| |
is part of (literal)
| |
length (μ)
| |
city
| |
country
| |
foaf:isPrimaryTopicOf
| |
is location
of | |
is Link from a Wikipage to another Wikipage
of | |