The Copper Mountain Solar Facility is a 802 megawatt (MWAC) solar photovoltaic power plant in Boulder City, Nevada, United States. The plant was developed by Sempra Generation. When the first unit of the facility entered service on December 1, 2010, it was the largest photovoltaic plant in the U.S. at 58 MW. With the opening of Copper Mountain V in March 2021, it again became the largest in the United States. It is co-located with the 64 MW Nevada Solar One, 150 MW Boulder Solar, and 300 MW Techren Solar projects in the Eldorado Valley, thus forming a more than 1 gigawatt (GW) solar generating complex. By comparison, generating capacity at the nearby Hoover Dam is about 2 GW.

AttributesValues
rdf:type
rdfs:label
  • Copper Mountain Solar Facility (en)
  • Copper Mountain Solar Facility (ru)
rdfs:comment
  • The Copper Mountain Solar Facility is a 802 megawatt (MWAC) solar photovoltaic power plant in Boulder City, Nevada, United States. The plant was developed by Sempra Generation. When the first unit of the facility entered service on December 1, 2010, it was the largest photovoltaic plant in the U.S. at 58 MW. With the opening of Copper Mountain V in March 2021, it again became the largest in the United States. It is co-located with the 64 MW Nevada Solar One, 150 MW Boulder Solar, and 300 MW Techren Solar projects in the Eldorado Valley, thus forming a more than 1 gigawatt (GW) solar generating complex. By comparison, generating capacity at the nearby Hoover Dam is about 2 GW. (en)
  • Copper Mountain Solar Facility — фотоэлектрическая станция общей мощностью 458 МВт. Расположена в округе Кларк, Невада, США. Изначально проектная мощность станции составляла 58 МВт. Строительство началось в январе 2010 года и было завершено в декабре того же года. Copper Mountain Solar Facility в 2011 году получила вознаграждение Excellence in Renewable Energy Awards в категории "Проект года". Стоимость проекта составила 141 миллион долларов США. (ru)
foaf:name
  • Copper Mountain Solar Facility (en)
name
  • Copper Mountain Solar Facility (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Eldorado_Valley_Solar_Farms.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Nevada_Solar_One.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
solar type
  • PV (en)
dbp:wikiPageUsesTemplate
thumbnail
country
  • United States (en)
image caption
  • Copper Mountain Solar 1 (en)
location
owner
status
  • O (en)
commissioned
  • Dec 2008 - Mar 2021 (en)
georss:point
  • 35.78333333333333 -114.99166666666666
has abstract
  • The Copper Mountain Solar Facility is a 802 megawatt (MWAC) solar photovoltaic power plant in Boulder City, Nevada, United States. The plant was developed by Sempra Generation. When the first unit of the facility entered service on December 1, 2010, it was the largest photovoltaic plant in the U.S. at 58 MW. With the opening of Copper Mountain V in March 2021, it again became the largest in the United States. It is co-located with the 64 MW Nevada Solar One, 150 MW Boulder Solar, and 300 MW Techren Solar projects in the Eldorado Valley, thus forming a more than 1 gigawatt (GW) solar generating complex. By comparison, generating capacity at the nearby Hoover Dam is about 2 GW. (en)
  • Copper Mountain Solar Facility — фотоэлектрическая станция общей мощностью 458 МВт. Расположена в округе Кларк, Невада, США. Изначально проектная мощность станции составляла 58 МВт. Строительство началось в январе 2010 года и было завершено в декабре того же года. Copper Mountain Solar Facility в 2011 году получила вознаграждение Excellence in Renewable Energy Awards в категории "Проект года". Стоимость проекта составила 141 миллион долларов США. В 2011 году было принято решение о расширении электростанции. Расширение предусматривает три очереди строительства. Строительство второй и третьей очереди было завершено в начале 2015 года. (ru)
construction began
  • January 2010 (en)
ps annual generation
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (62 GB total memory, 60 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software