About: Border-to-Border Trail     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Trail109460312, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FBorder-to-Border_Trail

The Border-to-Border (B2B) Trail is a partially constructed non-motorized trail in Washtenaw County, Michigan. The trail is planned to cover approximately 35 miles (56 km) from Livingston County to Wayne County along the Huron River.

AttributesValues
rdf:type
rdfs:label
  • Border-to-Border Trail (en)
rdfs:comment
  • The Border-to-Border (B2B) Trail is a partially constructed non-motorized trail in Washtenaw County, Michigan. The trail is planned to cover approximately 35 miles (56 km) from Livingston County to Wayne County along the Huron River. (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Border-To-Border_Trail_marker_Superior_Township_Michigan.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
has abstract
  • The Border-to-Border (B2B) Trail is a partially constructed non-motorized trail in Washtenaw County, Michigan. The trail is planned to cover approximately 35 miles (56 km) from Livingston County to Wayne County along the Huron River. In thirteen segments from A to M, it will link Huron-Clinton Metroparks with Dexter Township, the Village of Dexter, Scio Township, the City of Ann Arbor, Ann Arbor Township, Ypsilanti Township, and the City of Ypsilanti. Segment A is located on the Livingston County border to the north-west and M on the Wayne County border in the south-east. The trail is being developed in sub-segments (e.g. C1 and C2 make up part of C). As each segment is developed, there are sometimes refinements to the actual path. In the interest of continuity, parts of the current trail do not reflect the planned final route, but use existing surface streets until the final trail can be constructed. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software