About: Bombardier Innovia APM 300R C801B     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:Train, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FBombardier_Innovia_APM_300R_C801B&graph=http%3A%2F%2Fdbpedia.org&graph=http%3A%2F%2Fdbpedia.org

The Bombardier Innovia APM 300R C801B (APM 300R) is the third generation of an automated people mover (APM) train built by CRRC Puzhen Alstom Transportation Systems (joint venture of Alstom [formerly Bombardier Transportation] and CRRC Nanjing Puzhen) for the Bukit Panjang LRT line, to replace the existing C801 trains built in 1999. The C801B trains are also the first of its kind to reuse the retro AC third rail shoes compared to the newer Light Rail lines around the world that utilises the APM 300 system that have been built with DC third rail instead of AC.

AttributesValues
rdf:type
rdfs:label
  • Bombardier Innovia APM 300R C801B (en)
rdfs:comment
  • The Bombardier Innovia APM 300R C801B (APM 300R) is the third generation of an automated people mover (APM) train built by CRRC Puzhen Alstom Transportation Systems (joint venture of Alstom [formerly Bombardier Transportation] and CRRC Nanjing Puzhen) for the Bukit Panjang LRT line, to replace the existing C801 trains built in 1999. The C801B trains are also the first of its kind to reuse the retro AC third rail shoes compared to the newer Light Rail lines around the world that utilises the APM 300 system that have been built with DC third rail instead of AC. (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
gauge
  • central guideway with rubber tyres (en)
carbody
collectionmethod
coupling
date
  • May 2022 (en)
depots
doors
electricsystem
factory
family
fleetnumbers
formation
  • Single vehicles that can be coupled to form 2-car trains (en)
lines
  • Bukit Panjang LRT line (en)
manufacturer
  • CRRC Puzhen Alstom Transportation Systems (en)
numberbuilt
operator
  • SMRT Trains Ltd (en)
reason
replaced
safety
  • Alstom Cityflo 650 moving block CBTC ATC under ATO GoA 4 , with subsystems of ATP, ATS and CBI (en)
traction
  • Alstom MITrac IGBT–VVVF (en)
yearconstruction
has abstract
  • The Bombardier Innovia APM 300R C801B (APM 300R) is the third generation of an automated people mover (APM) train built by CRRC Puzhen Alstom Transportation Systems (joint venture of Alstom [formerly Bombardier Transportation] and CRRC Nanjing Puzhen) for the Bukit Panjang LRT line, to replace the existing C801 trains built in 1999. The C801B trains are also the first of its kind to reuse the retro AC third rail shoes compared to the newer Light Rail lines around the world that utilises the APM 300 system that have been built with DC third rail instead of AC. (en)
aarwheels
  • A-A (en)
prov:wasDerivedFrom
page length (characters) of wiki page
number built
year of construction
manufacturer
operator
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (62 GB total memory, 53 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software