The Bhote Koshi Power Plant (also known as Upper Bhote Koshi Project) is a run-of-the-river power plant in Sindhulpalchok District, Nepal. It was constructed between 1997 and 2000 with power generation starting in January 2001. The project cost about US$98 million. The majority of finances was provided by Panda Energy International. The dam, located at 27°56′20″N 85°56′42″E / 27.93889°N 85.94500°E, diverts water downstream into a 3,300 m (10,827 ft) long head race tunnel which terminates into two penstocks that supply the two 22 MW Francis turbine-generators with water. The drop in elevation between the dam and power plant affords a normal hydraulic head of 135.5 m (445 ft).
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Bhote Koshi Power Plant (en)
|
rdfs:comment
| - The Bhote Koshi Power Plant (also known as Upper Bhote Koshi Project) is a run-of-the-river power plant in Sindhulpalchok District, Nepal. It was constructed between 1997 and 2000 with power generation starting in January 2001. The project cost about US$98 million. The majority of finances was provided by Panda Energy International. The dam, located at 27°56′20″N 85°56′42″E / 27.93889°N 85.94500°E, diverts water downstream into a 3,300 m (10,827 ft) long head race tunnel which terminates into two penstocks that supply the two 22 MW Francis turbine-generators with water. The drop in elevation between the dam and power plant affords a normal hydraulic head of 135.5 m (445 ft). (en)
|
foaf:name
| - Bhote Koshi Power Plant (en)
|
name
| - Bhote Koshi Power Plant (en)
|
geo:lat
| |
geo:long
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
spillway count
| |
spillway type
| |
dbp:wikiPageUsesTemplate
| |
cost
| |
country
| |
location
| |
location map
| |
opening
| |
status
| |
georss:point
| - 27.912777777777777 85.92388888888888
|
has abstract
| - The Bhote Koshi Power Plant (also known as Upper Bhote Koshi Project) is a run-of-the-river power plant in Sindhulpalchok District, Nepal. It was constructed between 1997 and 2000 with power generation starting in January 2001. The project cost about US$98 million. The majority of finances was provided by Panda Energy International. The dam, located at 27°56′20″N 85°56′42″E / 27.93889°N 85.94500°E, diverts water downstream into a 3,300 m (10,827 ft) long head race tunnel which terminates into two penstocks that supply the two 22 MW Francis turbine-generators with water. The drop in elevation between the dam and power plant affords a normal hydraulic head of 135.5 m (445 ft). The installed capacity of the project is 44 MW, whereas it has a power purchase agreement (PPA) with Nepal Electricity Authority for generation of 36MW maximum. The PPA dictates how much the project can generate for each month of the Nepali Calendar.During monsoon season (about three months each year) Bhote Koshi can operate at full installed capacity, with excess water still being spilt. During winter season however, power generation from the plant decreases drastically due to low river flows. (en)
|
construction began
| |
dam crosses
| |
dam type
| |
location map caption
| - Location of the Bhote Koshi Project in Nepal (en)
|
plant annual gen
| |
plant capacity
| - 36.0 (megawatt)
- Max. planned: 44 MW (en)
|
plant commission
| |