Beijing–Shijiazhuang high-speed railway (simplified Chinese: 京石客运专线; traditional Chinese: 京石客運專線; pinyin: Jīng-Shí Kèyùn Zhuān Xiàn) is a 281-kilometre high-speed rail line operated by China Railway High-speed between Beijing and Shijiazhuang (the provincial capital of Hebei) that opened on 26 December 2012 after 4 years of construction. The total investment is 43.87 billion yuan. The design speed is 350 km/h (220 mph), and the opening cut travel times between Beijing and Shijiazhuang from 2 hours to about 1 hour. This railway is the northern section of the 2,100 km (1,300 mi) high-speed Jinggang line connecting Beijing and Guangzhou, but also speeds up trains between Beijing and Taiyuan, which continue on the Shitai passenger railway.