Beaumont Generating Station is a hydroelectric dam built on the Saint-Maurice River, in , in upper Mauricie, Quebec, Canada. This hydroelectric dam is located between La Trenche generating station and La Tuque generating station. It is the fifth dam from the head of the river, among 11. Unlike the other hydroelectric plants on the river, which took the name from the rapids or falls they drowned, the Central Beaumont was named for , the former president of the Shawinigan Water & Power Company.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Beaumont Generating Station (en)
- Centrale Beaumont (fr)
- ГЕС Beaumont (uk)
|
rdfs:comment
| - Beaumont Generating Station is a hydroelectric dam built on the Saint-Maurice River, in , in upper Mauricie, Quebec, Canada. This hydroelectric dam is located between La Trenche generating station and La Tuque generating station. It is the fifth dam from the head of the river, among 11. Unlike the other hydroelectric plants on the river, which took the name from the rapids or falls they drowned, the Central Beaumont was named for , the former president of the Shawinigan Water & Power Company. (en)
- La centrale Beaumont est une centrale hydroélectrique située sur le Saint-Maurice, dans la Zec de la Croche, dans l'Agglomération de La Tuque, en Mauricie, au Québec (Canada). La Centrale Beaumont est situé entre la Centrale de la Trenche et la Centrale de La Tuque. Cette centrale hydroélectrique est la 5e de cette rivière à partir de l'amont sur les 11 qu'elle comprend. Contrairement aux autres centrales de la rivière qui portent le nom des rapides ou des chutes qu'elles ont noyés, celle-ci célèbre , ancien président de la Shawinigan Water and Power Company. (fr)
- ГЕС Beaumont – гідроелектростанція у канадській провінції Квебек. Знаходячись між ГЕС La Trenche (вище по течії) та ГЕС La Tuque, входить до складу каскаду на річці Saint-Maurice, яка у місті Труа-Рів'єр впадає ліворуч до річки Святого Лаврентія (дренує Великі озера). В межах проекту річку перекрили бетонною гравітаційною греблею висотою 65 метрів та довжиною 495 метрів. Вона утримує витягнуте по долині Saint-Maurice на 26 км водосховище з площею поверхні 5 км2 та об’ємом 76 млн м3. (uk)
|
foaf:name
| - Beaumont Generating Station (en)
|
name
| - Beaumont Generating Station (en)
|
geo:lat
| |
geo:long
| |
foaf:depiction
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
country
| |
image caption
| - View of the Central Beaumont (en)
|
location
| |
opening
| |
owner
| |
status
| |
georss:point
| - 47.55555555555556 -72.83666666666667
|
has abstract
| - Beaumont Generating Station is a hydroelectric dam built on the Saint-Maurice River, in , in upper Mauricie, Quebec, Canada. This hydroelectric dam is located between La Trenche generating station and La Tuque generating station. It is the fifth dam from the head of the river, among 11. Unlike the other hydroelectric plants on the river, which took the name from the rapids or falls they drowned, the Central Beaumont was named for , the former president of the Shawinigan Water & Power Company. (en)
- La centrale Beaumont est une centrale hydroélectrique située sur le Saint-Maurice, dans la Zec de la Croche, dans l'Agglomération de La Tuque, en Mauricie, au Québec (Canada). La Centrale Beaumont est situé entre la Centrale de la Trenche et la Centrale de La Tuque. Cette centrale hydroélectrique est la 5e de cette rivière à partir de l'amont sur les 11 qu'elle comprend. Contrairement aux autres centrales de la rivière qui portent le nom des rapides ou des chutes qu'elles ont noyés, celle-ci célèbre , ancien président de la Shawinigan Water and Power Company. (fr)
- ГЕС Beaumont – гідроелектростанція у канадській провінції Квебек. Знаходячись між ГЕС La Trenche (вище по течії) та ГЕС La Tuque, входить до складу каскаду на річці Saint-Maurice, яка у місті Труа-Рів'єр впадає ліворуч до річки Святого Лаврентія (дренує Великі озера). В межах проекту річку перекрили бетонною гравітаційною греблею висотою 65 метрів та довжиною 495 метрів. Вона утримує витягнуте по долині Saint-Maurice на 26 км водосховище з площею поверхні 5 км2 та об’ємом 76 млн м3. Пригреблевий машинний зал станції у 1958-1959 роках обладнали шістьома турбінами типу Френсіс загальною потужністю 270 МВт, які використовують напір у 37,8 метра. (uk)
|
construction began
| |
dam crosses
| |
dam height foundation
| |
dam type
| |
plant capacity
| |
plant operator
| |
plant turbines
| |
plant type
| |
res capacity total
| |
res catchment
| |
res elevation
| |
vastest lake
| |
part
| |
river
| |
building start year
| |
prov:wasDerivedFrom
| |
length (km)
| |
page length (characters) of wiki page
| |
building start date
| |
description
| |
height (μ)
| |
length (μ)
| |
opening year
| |
status
| |
country
| |
owner
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(-72.836669921875 47.555557250977)
|
is Link from a Wikipage to another Wikipage
of | |