Barapukuria Power Station is located near Durgapur, Dinajpur, Bangladesh. It consists of two 125 megawatt units and one 275 MW unit. This coal-fired power station was commissioned in 2006, and is operated by the Bangladesh Power Development Board (BPDB). There are three units of the plant, operated by BPDB, which are jointly able to generate 525MW power. Two units are capable of generating 250MW power together and third unit can generate 275MW power which is synchronised with national from late December 2017. On 14 September 2018, the coal plant started to produce electricity again.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Barapukuria Power Station (en)
- ТЕС Барапукурія (uk)
|
rdfs:comment
| - Barapukuria Power Station is located near Durgapur, Dinajpur, Bangladesh. It consists of two 125 megawatt units and one 275 MW unit. This coal-fired power station was commissioned in 2006, and is operated by the Bangladesh Power Development Board (BPDB). There are three units of the plant, operated by BPDB, which are jointly able to generate 525MW power. Two units are capable of generating 250MW power together and third unit can generate 275MW power which is synchronised with national from late December 2017. On 14 September 2018, the coal plant started to produce electricity again. (en)
- ТЕС Барапукурія (Barapukuria) – теплова електростанція, що на північному заході Бангладеш, яка належить державній компанії Bangladesh Power Development Board (BPDB). Перша вугільна електростанція в історії енергетики країни та наразі єдина, яка розрахована на використання місцевого ресурсу. У 2018-му ввели в експлуатацію третій блок з паровою турбіною потужністю 275 МВт, підряд на спорудження якого виконала китайська компанія Harbin Electric International. В 2018/2019 році його фактична чиста паливна ефективність становила 32,4%. (uk)
|
geo:lat
| |
geo:long
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
georss:point
| |
has abstract
| - Barapukuria Power Station is located near Durgapur, Dinajpur, Bangladesh. It consists of two 125 megawatt units and one 275 MW unit. This coal-fired power station was commissioned in 2006, and is operated by the Bangladesh Power Development Board (BPDB). There are three units of the plant, operated by BPDB, which are jointly able to generate 525MW power. Two units are capable of generating 250MW power together and third unit can generate 275MW power which is synchronised with national from late December 2017. The power plan was shut down after the discovery of Barapukuria coal scam on 22 July 2018, due to acute shortage of coal. Before the shut down of the plant it had been supplying around 380MW power to the national grid on an average. When the power plant shutdown in first time, the people of eight northern districts of Rangpur and Dinajpur regions suffered most lacking of electricity. After the consideration of their suffering, BPDB decided to restart one of its units for five days from August 20 to lessen public suffering. On 28 August in 2018; the plant shut down again. On 14 September 2018, the coal plant started to produce electricity again. (en)
- ТЕС Барапукурія (Barapukuria) – теплова електростанція, що на північному заході Бангладеш, яка належить державній компанії Bangladesh Power Development Board (BPDB). Перша вугільна електростанція в історії енергетики країни та наразі єдина, яка розрахована на використання місцевого ресурсу. В 2006 році на майданчику станції стали до ладу два конденсаційні енергоблоки з паровими турбінами потужністю по 125 МВт. Основне обладнання для них (котли, турбіни та генератори) постачила китайська компанія Shanghai Electric Power Generation Engineering. Станом на середину 2010-х через технічний стан фактичні показники блоків зменшились до 80 МВт, при цьому в 2018/2019 році фактична чиста паливна ефективність становила лише 19,4%. У 2018-му ввели в експлуатацію третій блок з паровою турбіною потужністю 275 МВт, підряд на спорудження якого виконала китайська компанія Harbin Electric International. В 2018/2019 році його фактична чиста паливна ефективність становила 32,4%. Вугілля для роботи ТЕС отримують по конвеєру із розташованої неподалік вугільної копальні Барапукурія. Щоб отримувати воду для охолодження перших двох блоків спорудили 14 свердловин. Видача продукції відбувається по ЛЕП, розрахованим на роботу під напругою 230 кВ та 132 кВ. (uk)
|
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(88.949401855469 25.554100036621)
|
is Link from a Wikipage to another Wikipage
of | |
is foaf:primaryTopic
of | |