About: Allington Quarry Waste Management Facility     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FAllington_Quarry_Waste_Management_Facility

The Allington Quarry Waste Management Facility is an integrated waste management centre in Allington, Kent. It is the site of the Allington Energy from Waste (EfW) Incinerator. The incinerator is owned by FCC Environment as Kent Enviropower. The facility, which has involved an investment of over £150 Million, is able to process 500,000 tonnes per annum of waste and has the ability to produce 40MW of power. The facility takes non-hazardous waste from households and businesses in Kent and the surrounding area for recycling and energy recovery. Materials separated by householders are sorted and sent for recycling, with the remainder being used to generate electricity to power the facility and for the local supply network.

AttributesValues
rdf:type
rdfs:label
  • Allington Quarry Waste Management Facility (en)
rdfs:comment
  • The Allington Quarry Waste Management Facility is an integrated waste management centre in Allington, Kent. It is the site of the Allington Energy from Waste (EfW) Incinerator. The incinerator is owned by FCC Environment as Kent Enviropower. The facility, which has involved an investment of over £150 Million, is able to process 500,000 tonnes per annum of waste and has the ability to produce 40MW of power. The facility takes non-hazardous waste from households and businesses in Kent and the surrounding area for recycling and energy recovery. Materials separated by householders are sorted and sent for recycling, with the remainder being used to generate electricity to power the facility and for the local supply network. (en)
foaf:name
  • Allington Quarry Waste Management Facility (en)
name
  • Allington Quarry Waste Management Facility (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Integrated_waste_disposal_facility,_Allington_-_geograph.org.uk_-_133813.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
th fuel primary
  • Waste (en)
dbp:wikiPageUsesTemplate
thumbnail
country
  • England (en)
image caption
  • Allington Quarry Waste Management Facility in March 2006 (en)
location
operator
  • Kent Enviropower (en)
commissioned
georss:point
  • 51.2928 0.4912
has abstract
  • The Allington Quarry Waste Management Facility is an integrated waste management centre in Allington, Kent. It is the site of the Allington Energy from Waste (EfW) Incinerator. The incinerator is owned by FCC Environment as Kent Enviropower. The facility, which has involved an investment of over £150 Million, is able to process 500,000 tonnes per annum of waste and has the ability to produce 40MW of power. The facility takes non-hazardous waste from households and businesses in Kent and the surrounding area for recycling and energy recovery. Materials separated by householders are sorted and sent for recycling, with the remainder being used to generate electricity to power the facility and for the local supply network. Built in a former ragstone quarry, the site includes one 80 metres (260 ft) high chimney, and covers an area of 84 acres (34 ha), of which 67 acres (27 ha) will eventually become parkland, and permanently employs around 100 people. Under a 25-year contract with Kent County Council, Over 325,000 tonnes of municipal waste, from Maidstone, Sevenoaks, Tunbridge Wells, Tonbridge and Malling, Dartford, Gravesham and Swale councils will be processed each year. The centre is a major waste facility and will contribute to Kent meeting its LATS obligations for the diversion of waste from landfill. The incinerator employs fluidized bed incineration technology and has been in commercial operation since December 2008. (en)
name official
  • Allington Quarry Waste (en)
  • Management Facility (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
opening year
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(0.49120000004768 51.29280090332)
is Link from a Wikipage to another Wikipage of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 51 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software