About: Allerton waste recovery park     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:PowerStation, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FAllerton_waste_recovery_park

Allerton waste recovery park is a waste recovery and incineration site located on a former quarry at Allerton Mauleverer, near Knaresborough, England. It is operated by AmeyCespa on behalf of North Yorkshire County Council and City of York Council, the site is capable of handling 320,000 tonnes (350,000 tons) of household waste per year. The site is expected to cost £1.4 billion over 25 years, but is estimated it that the cost of not incinerating over the same time period would be £1.7 billion in landfill and other costs.

AttributesValues
rdf:type
rdfs:label
  • Allerton waste recovery park (en)
  • Аллертинский парк утилизации отходов (ru)
rdfs:comment
  • Allerton waste recovery park is a waste recovery and incineration site located on a former quarry at Allerton Mauleverer, near Knaresborough, England. It is operated by AmeyCespa on behalf of North Yorkshire County Council and City of York Council, the site is capable of handling 320,000 tonnes (350,000 tons) of household waste per year. The site is expected to cost £1.4 billion over 25 years, but is estimated it that the cost of not incinerating over the same time period would be £1.7 billion in landfill and other costs. (en)
  • Аллертинский парк утилизации отходов — площадка для утилизации и сжигания отходов, расположенная на территории бывшего карьера в , недалеко от города , Англия. Им управляет компания AmeyCespa от и , объект способен перерабатывать 320 000 тонн бытовых отходов в год. Ожидалось, что строительство объекта обойдётся в 1,4 миллиарда фунтов стерлингов за 25 лет, но, по оценкам экспертов, стоимость отказа от сжигания за тот же период времени составит 1,7 миллиарда фунтов стерлингов на оплату свалки и других расходов. (ru)
foaf:name
  • Allerton waste recovery park (en)
foaf:homepage
name
  • Allerton waste recovery park (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/The_incinerator_at_Allerton_Mauleverer.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
th fuel primary
  • Waste (en)
dbp:wikiPageUsesTemplate
thumbnail
country
  • England (en)
image caption
  • The incinerator at Allerton Mauleverer (en)
location
operator
  • AmeyCespa (en)
owner
status
  • O (en)
website
commissioned
georss:point
  • 54.033 -1.3813
has abstract
  • Allerton waste recovery park is a waste recovery and incineration site located on a former quarry at Allerton Mauleverer, near Knaresborough, England. It is operated by AmeyCespa on behalf of North Yorkshire County Council and City of York Council, the site is capable of handling 320,000 tonnes (350,000 tons) of household waste per year. The site is expected to cost £1.4 billion over 25 years, but is estimated it that the cost of not incinerating over the same time period would be £1.7 billion in landfill and other costs. Despite being labelled as just an incinerator, it also recycles and uses biodegradable waste to generate biogas, which is why it is known as a waste recovery park. The site is just off the A168, 4 miles (6.4 km) east of Knaresborough and 7 miles (11 km) north of Wetherby. (en)
  • Аллертинский парк утилизации отходов — площадка для утилизации и сжигания отходов, расположенная на территории бывшего карьера в , недалеко от города , Англия. Им управляет компания AmeyCespa от и , объект способен перерабатывать 320 000 тонн бытовых отходов в год. Ожидалось, что строительство объекта обойдётся в 1,4 миллиарда фунтов стерлингов за 25 лет, но, по оценкам экспертов, стоимость отказа от сжигания за тот же период времени составит 1,7 миллиарда фунтов стерлингов на оплату свалки и других расходов. Несмотря на то, что он назван как просто мусоросжигательный завод, он также перерабатывает и использует биоразлагаемые отходы для производства биогаза, поэтому он известен как парк утилизации отходов. Участок находится недалеко от автомагистрали , в 4 милях (6,4 км) к востоку от Нерсборо и в 7 милях (11 км) к северу от Уэтерби. (ru)
construction began
ps annual generation
building start year
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • 2015
opening year
status
  • O
average annual gro...er generation (J)
owner
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-1.3812999725342 54.033000946045)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (62 GB total memory, 54 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software