The Aitken Spence Power Station (formerly referred to as the Meethotamulla Power Station) is a municipal solid waste-fired thermal power station currently under construction at , Sri Lanka. It was originally planned to be built at Meethotamulla, the site of a large solid waste landfill which was under international media spotlight after the 2017 Meethotamulla garbage landslide which killed over 30 people. The power station will operate approximately 7500 hours a year, utilizing the 700 metric tons (1,500,000 lb) of fresh waste from the Colombo Municipal Council area, daily. The power station in being built together with the KCHT Power Station.

AttributesValues
rdf:type
rdfs:label
  • Aitken Spence Power Station (en)
rdfs:comment
  • The Aitken Spence Power Station (formerly referred to as the Meethotamulla Power Station) is a municipal solid waste-fired thermal power station currently under construction at , Sri Lanka. It was originally planned to be built at Meethotamulla, the site of a large solid waste landfill which was under international media spotlight after the 2017 Meethotamulla garbage landslide which killed over 30 people. The power station will operate approximately 7500 hours a year, utilizing the 700 metric tons (1,500,000 lb) of fresh waste from the Colombo Municipal Council area, daily. The power station in being built together with the KCHT Power Station. (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
has abstract
  • The Aitken Spence Power Station (formerly referred to as the Meethotamulla Power Station) is a municipal solid waste-fired thermal power station currently under construction at , Sri Lanka. It was originally planned to be built at Meethotamulla, the site of a large solid waste landfill which was under international media spotlight after the 2017 Meethotamulla garbage landslide which killed over 30 people. The power station will operate approximately 7500 hours a year, utilizing the 700 metric tons (1,500,000 lb) of fresh waste from the Colombo Municipal Council area, daily. The power station in being built together with the KCHT Power Station. The facility will generate 11.5 megawatt (MW) of power, of which 9.7 MW will be sold to the state-owned Ceylon Electricity Board, at a rate of Rs. 37.10 per KWh generated. Construction of the US$98 million power station began on 10 August 2017, and is expected to complete by 2020. It will be operated by Western Power Company Limited, a subsidiary of Aitken Spence. The power station's PUCSL energy license is EL/GS/13-03. (en)
location map zoom
ps data
  • EL/GS/13-03 (en)
ps label
  • PUCSL license (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 49 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software