Afşin-Elbistan C was a planned 1800-MW coal-fired power station which was proposed to be built in Turkey by the state-owned mining company Maden Holding. Estimated to cost over 17 billion lira, at planned capacity it would have generated about 3% of the nation's electricity. According to the environmental impact assessment (EIA) the plant would have burned 23 million tonnes of lignite annually, and emit over 61 million tonnes of CO2 each year for 35 years. However in 2021 Turkey targeted net zero carbon emissions by 2053. It would have been the least carbon efficient coal-fired power station and the largest single emitter of greenhouse gas in the world. In March 2022 Kahramanmaraş Administrative Court stopped the project on the grounds of possible soil and air pollution - although this dec

AttributesValues
rdf:type
rdfs:label
  • Afşin-Elbistan C power station (en)
rdfs:comment
  • Afşin-Elbistan C was a planned 1800-MW coal-fired power station which was proposed to be built in Turkey by the state-owned mining company Maden Holding. Estimated to cost over 17 billion lira, at planned capacity it would have generated about 3% of the nation's electricity. According to the environmental impact assessment (EIA) the plant would have burned 23 million tonnes of lignite annually, and emit over 61 million tonnes of CO2 each year for 35 years. However in 2021 Turkey targeted net zero carbon emissions by 2053. It would have been the least carbon efficient coal-fired power station and the largest single emitter of greenhouse gas in the world. In March 2022 Kahramanmaraş Administrative Court stopped the project on the grounds of possible soil and air pollution - although this dec (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
bot
  • InternetArchiveBot (en)
date
  • April 2021 (en)
fix-attempted
  • yes (en)
has abstract
  • Afşin-Elbistan C was a planned 1800-MW coal-fired power station which was proposed to be built in Turkey by the state-owned mining company Maden Holding. Estimated to cost over 17 billion lira, at planned capacity it would have generated about 3% of the nation's electricity. According to the environmental impact assessment (EIA) the plant would have burned 23 million tonnes of lignite annually, and emit over 61 million tonnes of CO2 each year for 35 years. However in 2021 Turkey targeted net zero carbon emissions by 2053. It would have been the least carbon efficient coal-fired power station and the largest single emitter of greenhouse gas in the world. In March 2022 Kahramanmaraş Administrative Court stopped the project on the grounds of possible soil and air pollution - although this decision could be appealed to the Council of State (Danıştay). (en)
prov:wasDerivedFrom
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (62 GB total memory, 44 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software