The 17th Street Bridge (officially named the Alma Lee Loy Bridge in 2012) is a fixed concrete bridge that spans the Indian River intracoastal waterway in Indian River County, Florida. The bridge, started in 1977, was constructed by Gulf Contracting Inc, FL and was completed in 1979. The Florida Department of Transportation bridge number is 880077. The bridge has a total of four motor vehicle lanes and two bicycle lanes. The vertical clearance is 65 ft (20 m). On the river it crosses the ICW at Statute Mile 953, south of flashing day beacon #145A.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - 17th Street Bridge (Vero Beach, Florida) (en)
|
rdfs:comment
| - The 17th Street Bridge (officially named the Alma Lee Loy Bridge in 2012) is a fixed concrete bridge that spans the Indian River intracoastal waterway in Indian River County, Florida. The bridge, started in 1977, was constructed by Gulf Contracting Inc, FL and was completed in 1979. The Florida Department of Transportation bridge number is 880077. The bridge has a total of four motor vehicle lanes and two bicycle lanes. The vertical clearance is 65 ft (20 m). On the river it crosses the ICW at Statute Mile 953, south of flashing day beacon #145A. (en)
|
foaf:name
| |
geo:lat
| |
geo:long
| |
foaf:depiction
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
bot
| |
bridge name
| |
crosses
| |
date
| |
design
| - concrete deck 4 lane (en)
|
fix-attempted
| |
image size
| |
locale
| |
open
| |
georss:point
| |
has abstract
| - The 17th Street Bridge (officially named the Alma Lee Loy Bridge in 2012) is a fixed concrete bridge that spans the Indian River intracoastal waterway in Indian River County, Florida. The bridge, started in 1977, was constructed by Gulf Contracting Inc, FL and was completed in 1979. The Florida Department of Transportation bridge number is 880077. The bridge has a total of four motor vehicle lanes and two bicycle lanes. The vertical clearance is 65 ft (20 m). On the river it crosses the ICW at Statute Mile 953, south of flashing day beacon #145A. In 2018, the bridge was found to be in critical condition, needing prompt repair. It was assessed to be structurally deficient in May 2020 according to Florida Department of Transportation inspection reports. A major overhaul is planned in 2024. (en)
|
dbp:wordnet_type
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
opening year
| |
crosses
| |
located in area
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(-80.36799621582 27.631999969482)
|
is Link from a Wikipage to another Wikipage
of | |
is Wikipage redirect
of | |
is foaf:primaryTopic
of | |