The Shiyazi Dam is a concrete gravity dam on the , a tributary of the Wu River, in Wuchuan County, Guizhou Province, China. The primary purpose of the dam is hydroelectric power generation. Construction on the dam began in 2007 and concrete pouring in April 2008. The reservoir began to impound in September 2010. The dam was "capped off" with concrete on 24 December 2011 and the generators were commissioned a week later on 31 December. The dam, being located in a steep portion of Meilin Canyon, was difficult to construct. The 134.5 m (441 ft) tall dam withholds a reservoir with a capacity of 321,500,000 m3 (260,644 acre⋅ft) and was constructed with both normal concrete and roller-compacted concrete. The dams power station is located 320 m (1,050 ft) downstream and contains two 70 MW Francis
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Shiyazi Dam (en)
- Шіяцзи (uk)
|
rdfs:comment
| - Шиязі — бетонна гравітаційна гребля та ГЕС на річці (Hongjiadu), притоці річки , повіт Учуань-Гелао-Мяо, провінція Гуйчжоу, Китай. Основна мета греблі ГЕС вироблення електроенергії. Будівництво греблі розпочалося в 2007 році. Наповнення водосховища розпочалося у вересні 2010 року. Генератори були введені в експлуатацію 31 грудня 2011. Гребля, розташована у важкодоступному місці - каньйон Меїлін. Гребля заввишки 134,5 м, утворює водосховище об'ємом 321 500 000 м³. Будівництво відбувалось як зі звичайного так й . ГЕС має дві радіально-осьові гідротурбіни потужністю 70 МВт, або загальною встановленою потужністю 140 МВт (uk)
- The Shiyazi Dam is a concrete gravity dam on the , a tributary of the Wu River, in Wuchuan County, Guizhou Province, China. The primary purpose of the dam is hydroelectric power generation. Construction on the dam began in 2007 and concrete pouring in April 2008. The reservoir began to impound in September 2010. The dam was "capped off" with concrete on 24 December 2011 and the generators were commissioned a week later on 31 December. The dam, being located in a steep portion of Meilin Canyon, was difficult to construct. The 134.5 m (441 ft) tall dam withholds a reservoir with a capacity of 321,500,000 m3 (260,644 acre⋅ft) and was constructed with both normal concrete and roller-compacted concrete. The dams power station is located 320 m (1,050 ft) downstream and contains two 70 MW Francis (en)
|
foaf:name
| - Shiyazi Dam (en)
- 石垭子水电站 (en)
|
name
| |
geo:lat
| |
geo:long
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
country
| |
location
| |
location map
| |
opening
| |
owner
| - Guizhou Zhongshui Energy Co., Ltd (en)
|
status
| |
georss:point
| - 28.651944444444446 107.96805555555555
|
has abstract
| - The Shiyazi Dam is a concrete gravity dam on the , a tributary of the Wu River, in Wuchuan County, Guizhou Province, China. The primary purpose of the dam is hydroelectric power generation. Construction on the dam began in 2007 and concrete pouring in April 2008. The reservoir began to impound in September 2010. The dam was "capped off" with concrete on 24 December 2011 and the generators were commissioned a week later on 31 December. The dam, being located in a steep portion of Meilin Canyon, was difficult to construct. The 134.5 m (441 ft) tall dam withholds a reservoir with a capacity of 321,500,000 m3 (260,644 acre⋅ft) and was constructed with both normal concrete and roller-compacted concrete. The dams power station is located 320 m (1,050 ft) downstream and contains two 70 MW Francis turbine-generators for an installed capacity of 140 MW. (en)
- Шиязі — бетонна гравітаційна гребля та ГЕС на річці (Hongjiadu), притоці річки , повіт Учуань-Гелао-Мяо, провінція Гуйчжоу, Китай. Основна мета греблі ГЕС вироблення електроенергії. Будівництво греблі розпочалося в 2007 році. Наповнення водосховища розпочалося у вересні 2010 року. Генератори були введені в експлуатацію 31 грудня 2011. Гребля, розташована у важкодоступному місці - каньйон Меїлін. Гребля заввишки 134,5 м, утворює водосховище об'ємом 321 500 000 м³. Будівництво відбувалось як зі звичайного так й . ГЕС має дві радіально-осьові гідротурбіни потужністю 70 МВт, або загальною встановленою потужністю 140 МВт (uk)
|
construction began
| |
dam crosses
| |
dam type
| |
name official
| |
plant annual gen
| |
plant capacity
| |
plant commission
| |
plant turbines
| |
vastest lake
| |
part
| |
river
| |
gold:hypernym
| |
building start year
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
building start date
| |
description
| |
elevation (μ)
| |
height (μ)
| |
opening year
| |