About: Shiyazi Dam     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FShiyazi_Dam&graph=http%3A%2F%2Fdbpedia.org&graph=http%3A%2F%2Fdbpedia.org

The Shiyazi Dam is a concrete gravity dam on the , a tributary of the Wu River, in Wuchuan County, Guizhou Province, China. The primary purpose of the dam is hydroelectric power generation. Construction on the dam began in 2007 and concrete pouring in April 2008. The reservoir began to impound in September 2010. The dam was "capped off" with concrete on 24 December 2011 and the generators were commissioned a week later on 31 December. The dam, being located in a steep portion of Meilin Canyon, was difficult to construct. The 134.5 m (441 ft) tall dam withholds a reservoir with a capacity of 321,500,000 m3 (260,644 acre⋅ft) and was constructed with both normal concrete and roller-compacted concrete. The dams power station is located 320 m (1,050 ft) downstream and contains two 70 MW Francis

AttributesValues
rdf:type
rdfs:label
  • Shiyazi Dam (en)
  • Шіяцзи (uk)
rdfs:comment
  • Шиязі — бетонна гравітаційна гребля та ГЕС на річці (Hongjiadu), притоці річки , повіт Учуань-Гелао-Мяо, провінція Гуйчжоу, Китай. Основна мета греблі ГЕС вироблення електроенергії. Будівництво греблі розпочалося в 2007 році. Наповнення водосховища розпочалося у вересні 2010 року. Генератори були введені в експлуатацію 31 грудня 2011. Гребля, розташована у важкодоступному місці - каньйон Меїлін. Гребля заввишки 134,5 м, утворює водосховище об'ємом 321 500 000 м³. Будівництво відбувалось як зі звичайного так й . ГЕС має дві радіально-осьові гідротурбіни потужністю 70 МВт, або загальною встановленою потужністю 140 МВт (uk)
  • The Shiyazi Dam is a concrete gravity dam on the , a tributary of the Wu River, in Wuchuan County, Guizhou Province, China. The primary purpose of the dam is hydroelectric power generation. Construction on the dam began in 2007 and concrete pouring in April 2008. The reservoir began to impound in September 2010. The dam was "capped off" with concrete on 24 December 2011 and the generators were commissioned a week later on 31 December. The dam, being located in a steep portion of Meilin Canyon, was difficult to construct. The 134.5 m (441 ft) tall dam withholds a reservoir with a capacity of 321,500,000 m3 (260,644 acre⋅ft) and was constructed with both normal concrete and roller-compacted concrete. The dams power station is located 320 m (1,050 ft) downstream and contains two 70 MW Francis (en)
foaf:name
  • Shiyazi Dam (en)
  • 石垭子水电站 (en)
name
  • Shiyazi Dam (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
country
  • China (en)
location
location map
  • China (en)
opening
owner
  • Guizhou Zhongshui Energy Co., Ltd (en)
status
  • O (en)
georss:point
  • 28.651944444444446 107.96805555555555
has abstract
  • The Shiyazi Dam is a concrete gravity dam on the , a tributary of the Wu River, in Wuchuan County, Guizhou Province, China. The primary purpose of the dam is hydroelectric power generation. Construction on the dam began in 2007 and concrete pouring in April 2008. The reservoir began to impound in September 2010. The dam was "capped off" with concrete on 24 December 2011 and the generators were commissioned a week later on 31 December. The dam, being located in a steep portion of Meilin Canyon, was difficult to construct. The 134.5 m (441 ft) tall dam withholds a reservoir with a capacity of 321,500,000 m3 (260,644 acre⋅ft) and was constructed with both normal concrete and roller-compacted concrete. The dams power station is located 320 m (1,050 ft) downstream and contains two 70 MW Francis turbine-generators for an installed capacity of 140 MW. (en)
  • Шиязі — бетонна гравітаційна гребля та ГЕС на річці (Hongjiadu), притоці річки , повіт Учуань-Гелао-Мяо, провінція Гуйчжоу, Китай. Основна мета греблі ГЕС вироблення електроенергії. Будівництво греблі розпочалося в 2007 році. Наповнення водосховища розпочалося у вересні 2010 року. Генератори були введені в експлуатацію 31 грудня 2011. Гребля, розташована у важкодоступному місці - каньйон Меїлін. Гребля заввишки 134,5 м, утворює водосховище об'ємом 321 500 000 м³. Будівництво відбувалось як зі звичайного так й . ГЕС має дві радіально-осьові гідротурбіни потужністю 70 МВт, або загальною встановленою потужністю 140 МВт (uk)
construction began
dam crosses
dam type
  • Concrete gravity (en)
name official
  • 石垭子水电站 (en)
plant annual gen
plant capacity
plant commission
plant turbines
vastest lake
part
river
gold:hypernym
building start year
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • 2007
description
  • Concrete gravity (en)
elevation (μ)
height (μ)
opening year
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (62 GB total memory, 60 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software