About: Sha Tin to Central Link     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FSha_Tin_to_Central_Link&graph=http%3A%2F%2Fdbpedia.org&graph=http%3A%2F%2Fdbpedia.org

The Sha Tin to Central Link (abbreviated SCL; Chinese: 沙中線; Cantonese Yale: sā jūng sin) is an extension of the MTR rapid transit network. It is divided into two sections. The first section, named "Tuen Ma line (Phase 1)”, runs from Tai Wai station in the New Territories to Hung Hom station in Kowloon. The Tai Wai–Hung Hom segment connected the Ma On Shan line and West Rail line, forming the new Tuen Ma line. Operation of the Tai Wai to Kai Tak section began on 14 February 2020. The opening of the section from Kai Tak to Hung Hom was delayed and opened on 27 June 2021.

AttributesValues
rdf:type
rdfs:label
  • Sha Tin to Central Link (en)
  • 沙田至中環線 (ja)
  • 沙田至中環綫 (zh)
rdfs:comment
  • 沙田至中環線(さでんしちゅうかんせん、略称 : 沙中線)は香港新界沙田と香港島を結ぶ香港MTRの鉄道路線である。 (ja)
  • The Sha Tin to Central Link (abbreviated SCL; Chinese: 沙中線; Cantonese Yale: sā jūng sin) is an extension of the MTR rapid transit network. It is divided into two sections. The first section, named "Tuen Ma line (Phase 1)”, runs from Tai Wai station in the New Territories to Hung Hom station in Kowloon. The Tai Wai–Hung Hom segment connected the Ma On Shan line and West Rail line, forming the new Tuen Ma line. Operation of the Tai Wai to Kai Tak section began on 14 February 2020. The opening of the section from Kai Tak to Hung Hom was delayed and opened on 27 June 2021. (en)
  • 沙田至中環綫,又稱沙田至中西區鐵路(英語:Shatin to Central Link,縮寫SCL),簡稱沙中綫,是一個由港鐵公司負責興建的鐵路擴展項目,港鐵公司宣傳其為「鐵路2.0」之一部分。原來計劃路綫是由沙田直達中環,但現在拆分為「大圍至紅磡段」及「紅磡至金鐘段」兩部份: * 大圍至紅磡段(第一期,項目代號「東西走廊」):由馬鞍山綫向南伸延,經過顯徑(顯徑站,穿過獅子山到達大磡(鑽石山站),再經過啟德(啟德站),以上路段組成屯馬綫一期。其後再向南伸延,再經過啟德新發展區(馬頭涌、馬頭圍)(宋皇臺站)、土瓜灣(土瓜灣站),老龍坑(何文田站),到達紅磡(紅磡站)與現西鐵綫(尖沙咀支綫、九龍南綫)貫通,組成屯馬綫。屯馬綫一期(大圍至啟德)於2020年2月14日通車,而其餘部分於2021年6月27日通車。 * 紅磡至金鐘段(第二期,項目代號「南北走廊」):則由現東鐵綫向南伸延,經第四條過海鐵路到達香港島的灣仔會展一帶,最後以金鐘為終點站,於2022年5月15日通車。 整個計劃長約17公里,共有10座車站,當中5個新建車站:顯徑站、啟德站、宋皇臺站、土瓜灣站、會展站;以及5個與現有車站交匯(大圍站、重置紅磡站、以及擴建鑽石山站、何文田站、金鐘站)。 (zh)
rdfs:seeAlso
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/D024-D022_MTR_East_Rail_Line_06-02-2021.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Tuen_Ma_Line_C-Train_202103.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/City_One_Station_platform_northeast_extension.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/SCL_ga_map.png
  • http://commons.wikimedia.org/wiki/Special:FilePath/SP1950MOS.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Shatin_to_Central_Link_Causeway_Bay_section_under_construction_in_July_2015.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Shatin_to_Central_Link_proposal_final.svg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 51 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software