About: Norwood Assembly     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FNorwood_Assembly&graph=http%3A%2F%2Fdbpedia.org&graph=http%3A%2F%2Fdbpedia.org

Located in Norwood, Ohio, the Norwood Assembly Plant built General Motors cars between the years of 1923 and 1987. When it first opened, the plant employed 600 workers and was capable of producing 200 cars per day. At its peak in the early 1970s it employed nearly 9,000. Norwood is a suburb of Cincinnati.

AttributesValues
rdf:type
rdfs:label
  • Norwood Assembly (en)
rdfs:comment
  • Located in Norwood, Ohio, the Norwood Assembly Plant built General Motors cars between the years of 1923 and 1987. When it first opened, the plant employed 600 workers and was capable of producing 200 cars per day. At its peak in the early 1970s it employed nearly 9,000. Norwood is a suburb of Cincinnati. (en)
name
  • Norwood Assembly (en)
geo:lat
geo:long
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
industry
owner
products
georss:point
  • 39.16027777777778 -84.4486111111111
has abstract
  • Located in Norwood, Ohio, the Norwood Assembly Plant built General Motors cars between the years of 1923 and 1987. When it first opened, the plant employed 600 workers and was capable of producing 200 cars per day. At its peak in the early 1970s it employed nearly 9,000. Norwood is a suburb of Cincinnati. The first car rolled off the assembly line on August 13, 1923, a Chevrolet Superior. Among the cars built at Norwood were the Chevrolet Bel Air, Biscayne, Impala, Nova, Caprice, Camaro, Pontiac Firebird, and the Buick Apollo. The plant grew to cover an area of approximately 50 acres (200,000 m2) and had 3,000,000 square feet (279,000 m2) of space under roof. The facility had a number of labor disputes, including a 174-day-long strike in 1972, at the time the longest strike in GM history. As a result of the strike, 1,100 partially completed cars were scrapped or otherwise disposed of because it was not economically feasible to update them to the more stringent 1973 vehicle standards. After the strike GM opted to move Nova production away from Norwood to protect the model from future labor problems. (en)
operated
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-84.448608398438 39.160278320312)
is Link from a Wikipage to another Wikipage of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 67 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software