The North Bank tunnel concept was a hydroelectric scheme being developed by Meridian Energy on the Waitaki River in Canterbury, New Zealand. The $993 million project was expected to produce an additional 1,100 to 1,400 gigawatt-hours (4,000 to 5,000 TJ) per annum, and take up to 260 cubic metres per second (9,200 cu ft/s) of water from Lake Waitaki. The project would have resulted in a 275 gigawatt-hours (990 TJ) per annum reduction in output from the Waitaki hydro station. This project is at a similar location to Project Aqua, a hydroelectric power proposal abandoned by Meridian in 2004.

AttributesValues
rdf:type
rdfs:label
  • North Bank tunnel (en)
rdfs:comment
  • The North Bank tunnel concept was a hydroelectric scheme being developed by Meridian Energy on the Waitaki River in Canterbury, New Zealand. The $993 million project was expected to produce an additional 1,100 to 1,400 gigawatt-hours (4,000 to 5,000 TJ) per annum, and take up to 260 cubic metres per second (9,200 cu ft/s) of water from Lake Waitaki. The project would have resulted in a 275 gigawatt-hours (990 TJ) per annum reduction in output from the Waitaki hydro station. This project is at a similar location to Project Aqua, a hydroelectric power proposal abandoned by Meridian in 2004. (en)
foaf:name
  • North Bank tunnel project (en)
name
  • North Bank tunnel project (en)
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
th fuel primary
dbp:wikiPageUsesTemplate
location
  • Waitaki River, New Zealand (en)
owner
status
  • Proposed (en)
has abstract
  • The North Bank tunnel concept was a hydroelectric scheme being developed by Meridian Energy on the Waitaki River in Canterbury, New Zealand. The $993 million project was expected to produce an additional 1,100 to 1,400 gigawatt-hours (4,000 to 5,000 TJ) per annum, and take up to 260 cubic metres per second (9,200 cu ft/s) of water from Lake Waitaki. The project would have resulted in a 275 gigawatt-hours (990 TJ) per annum reduction in output from the Waitaki hydro station. Discovery of geological faultlines prompted a rethink of the project, including consideration of using a canal instead of a tunnel. Work on the project was suspended in January 2013 due to a forecast of flat demand for electricity for the next five years. Resource consents for the scheme lapsed in 2016. This project is at a similar location to Project Aqua, a hydroelectric power proposal abandoned by Meridian in 2004. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
status
  • Proposed
installed capacity (W)
owner
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 67 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software