The Nabinagar Thermal Power Station Project (NTPS) of Bhartiya Rail Bijlee Company Limited is a wholly owned subsidiary of the Indian Railways, Ministry of Railways, Government of India. It installs a 4X 250 MW thermal power plant at Nabinagar in Aurangabad district, Bihar, India. Nearly 90 per cent of the electricity generated from the plant is supplied to the railways to meet nationwide requirements and remaining 10 per cent is given to Bihar.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Nabinagar Thermal Power Project (en)
|
rdfs:comment
| - The Nabinagar Thermal Power Station Project (NTPS) of Bhartiya Rail Bijlee Company Limited is a wholly owned subsidiary of the Indian Railways, Ministry of Railways, Government of India. It installs a 4X 250 MW thermal power plant at Nabinagar in Aurangabad district, Bihar, India. Nearly 90 per cent of the electricity generated from the plant is supplied to the railways to meet nationwide requirements and remaining 10 per cent is given to Bihar. (en)
|
foaf:name
| - Nabinagar Thermal Power Station (en)
|
name
| - Nabinagar Thermal Power Station (en)
|
geo:lat
| |
geo:long
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
th fuel primary
| |
dbp:wikiPageUsesTemplate
| |
country
| |
location
| |
owner
| |
status
| |
commissioned
| |
georss:point
| |
has abstract
| - The Nabinagar Thermal Power Station Project (NTPS) of Bhartiya Rail Bijlee Company Limited is a wholly owned subsidiary of the Indian Railways, Ministry of Railways, Government of India. It installs a 4X 250 MW thermal power plant at Nabinagar in Aurangabad district, Bihar, India. Nearly 90 per cent of the electricity generated from the plant is supplied to the railways to meet nationwide requirements and remaining 10 per cent is given to Bihar. In 1989, the Chief Minister of Bihar and veteran leader Satyendra Narain Singh conceived the proposal to set up a NTPC's super thermal power project at Nabinagar in Bihar's Aurangabad district to Rajiv Gandhi, the Prime Minister of India and Congress leader. However, the project went into limbo as the following state governments failed to follow it. In 2007, Manmohan Singh's government finally put a stamp of approval on it. The joint venture agreement was signed on 6 November 2007 and the company was incorporated on 22 November 2007. Commercial generation started from Unit-1 and 2 (2X250MW) of Bharatiya Rail Bijli Company Limited in 2016. (en)
|
construction began
| |
location map caption
| - Location of the Nabinagar Thermal Power Station (en)
|
ps electrical capacity
| |
ps units manu model
| |
ps units operational
| |
gold:hypernym
| |
building start year
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
dbp:officer(ceo)_
| |
building start date
| |
opening year
| |
status
| |
installed capacity (W)
| |
owner
| |