About: Mangmoom Card     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : owl:Thing, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FMangmoom_Card&graph=http%3A%2F%2Fdbpedia.org&graph=http%3A%2F%2Fdbpedia.org

The Mangmoom Card (Thai for "spider") is a planned stored-value card for rapid transit systems in Bangkok. Currently, many commuters carry multiple cards, since the existing Rabbit Card only works on the BTS Skytrain and Bangkok BRT, while the MRT Plus card works on the MRT Blue Line and MRT Purple Line. The card was initially planned to launch in August 2016 but was delayed until at least 2018 as the Office of Transport and Traffic Policy and Planning required more time to integrate the ticketing systems of the different rail networks. In November 2016, Transport Minister Arkhom Termpittayapaisith announced the card would be available to use on the Skytrain, MRT, and Airport Rail Link by the middle of 2017.

AttributesValues
rdfs:label
  • Mangmoom Card (en)
  • Mangmoom Card (ru)
  • 蜘蛛卡 (zh)
rdfs:comment
  • 蜘蛛卡(英語:Mangmoom Card)是曼谷計劃中的儲值卡。目前多數通勤者都同時帶有多長卡,包括現時只可用於曼谷大眾運輸系統(BTS)和曼谷快速公交系統(BRT)的兔子卡,而MRT Plus卡則用於曼谷地鐵藍線和曼谷地鐵紫線。此卡原先預計於2016年8月推出,但因需要更多時間統一不同鐵路網的票務系統而推遲至2018年。2016年11月,交通部長Arkhom Termpittayapaisith宣佈蜘蛛卡會於2017年中起可用於BTS、地鐵和機場鐵路。 2017年4月公佈會作為票務系統,機場鐵路及部分電氣鐵路列車於2017年中加入,巴士和曼谷地鐵紫線自2017年10月啟用,BTS和曼谷地鐵藍線稍後再加入。2017年10月,卡片推遲至2018年中,並在推出時只能用於巴士和機場鐵路。 2018年6月,蜘蛛卡宣佈會在該月23日推出,並發行了20萬張卡,初期只可用於曼谷地鐵藍線和紫線,機場鐵路預計在10月加入。 2018年9月宣佈進一步推遲至2019年,2019年5月宣佈再一次推遲至2020年。 (zh)
  • The Mangmoom Card (Thai for "spider") is a planned stored-value card for rapid transit systems in Bangkok. Currently, many commuters carry multiple cards, since the existing Rabbit Card only works on the BTS Skytrain and Bangkok BRT, while the MRT Plus card works on the MRT Blue Line and MRT Purple Line. The card was initially planned to launch in August 2016 but was delayed until at least 2018 as the Office of Transport and Traffic Policy and Planning required more time to integrate the ticketing systems of the different rail networks. In November 2016, Transport Minister Arkhom Termpittayapaisith announced the card would be available to use on the Skytrain, MRT, and Airport Rail Link by the middle of 2017. (en)
  • Mangmoom Card (с тайского «паук») — электронная система платежа в транспортной системе Бангкока. Сейчас пассажиры носят несколько проездных из-за того, что существующая работает только на линиях BTS Skytrain и Bangkok BRT, когда карта MRT Plus действует на линиях MRT Blue Line и MRT Purple Line. Изначально запуск карты был запланирован на август 2016 года, но был отложен на 2018 год, так как Офису транспорта и планирования нужно было больше времени, чтобы соединить системы платежа разных железнодорожных сетей. В ноябреr 2016 года министр транспорта Аркхом Термпиттаяпайсит сообщил, что карта будет действовать на системах Skytrain, MRT и Airport Rail Link с середины 2017 года. (ru)
foaf:homepage
name
  • Mangmoom (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Mangmoom_Card.png
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
technology
unlimited use
  • Monthly Travel Card (en)
variant
  • Concession Cards (en)
  • Thailand Tourist Pass (en)
dbp:wikiPageUsesTemplate
thumbnail
launched
homepage
location
manager
note
  • * Tentaive (en)
operator
service
currency
has abstract
  • The Mangmoom Card (Thai for "spider") is a planned stored-value card for rapid transit systems in Bangkok. Currently, many commuters carry multiple cards, since the existing Rabbit Card only works on the BTS Skytrain and Bangkok BRT, while the MRT Plus card works on the MRT Blue Line and MRT Purple Line. The card was initially planned to launch in August 2016 but was delayed until at least 2018 as the Office of Transport and Traffic Policy and Planning required more time to integrate the ticketing systems of the different rail networks. In November 2016, Transport Minister Arkhom Termpittayapaisith announced the card would be available to use on the Skytrain, MRT, and Airport Rail Link by the middle of 2017. In April 2017, it was announced that the MRTA would act as a central clearing house for the ticketing system, with the Airport Rail Link and some electric rail services joining by mid-2017, buses and the MRT Purple line joining by October 2017, and the BTS Skytrain and MRT Blue Line later. In October 2017, it was announced that the card was again delayed to mid-2018 and will only work with buses and the Airport Rail Link at launch. In June 2018, it was announced the card would finally launch on the 23rd of that month, with 200,000 cards issued to the public, and would only work on the MRT Blue Line and MRT Purple Line at launch, with the Airport Rail Link to be added by October. In September 2018, it was announced that compatibility with the Airport Rail Link would be delayed until the end of 2018, and BMTA buses would be delayed until March 2019. (en)
  • Mangmoom Card (с тайского «паук») — электронная система платежа в транспортной системе Бангкока. Сейчас пассажиры носят несколько проездных из-за того, что существующая работает только на линиях BTS Skytrain и Bangkok BRT, когда карта MRT Plus действует на линиях MRT Blue Line и MRT Purple Line. Изначально запуск карты был запланирован на август 2016 года, но был отложен на 2018 год, так как Офису транспорта и планирования нужно было больше времени, чтобы соединить системы платежа разных железнодорожных сетей. В ноябреr 2016 года министр транспорта Аркхом Термпиттаяпайсит сообщил, что карта будет действовать на системах Skytrain, MRT и Airport Rail Link с середины 2017 года. В апреле 2017 было сообщено, что организация назначена ответственной за новую платежную систему, Airport Rail Link и некоторые другие железнодорожные сервисы присоединятся в середине года, автобусы и MRT Purple line — в октябре 2017, и ещё позже BTS Skytrain и MRT Blue Line. В октябре 2017 года запуск был снова перенесён на середину 2018, но только на автобусах и Airport Rail Link. В июне 2018 года был объявлен запуск карты 23 числа того же месяца, начиная с выдачи 200 000 карт пассажирам линий MRT Blue Line и MRT Purple Line, а с октября Airport Rail Link. В сентябре 2018 года было объявлено о том, что запуск карты на Airport Rail Link будет отложен до конца года, а на автобусах BMTA до марта 2019. (ru)
  • 蜘蛛卡(英語:Mangmoom Card)是曼谷計劃中的儲值卡。目前多數通勤者都同時帶有多長卡,包括現時只可用於曼谷大眾運輸系統(BTS)和曼谷快速公交系統(BRT)的兔子卡,而MRT Plus卡則用於曼谷地鐵藍線和曼谷地鐵紫線。此卡原先預計於2016年8月推出,但因需要更多時間統一不同鐵路網的票務系統而推遲至2018年。2016年11月,交通部長Arkhom Termpittayapaisith宣佈蜘蛛卡會於2017年中起可用於BTS、地鐵和機場鐵路。 2017年4月公佈會作為票務系統,機場鐵路及部分電氣鐵路列車於2017年中加入,巴士和曼谷地鐵紫線自2017年10月啟用,BTS和曼谷地鐵藍線稍後再加入。2017年10月,卡片推遲至2018年中,並在推出時只能用於巴士和機場鐵路。 2018年6月,蜘蛛卡宣佈會在該月23日推出,並發行了20萬張卡,初期只可用於曼谷地鐵藍線和紫線,機場鐵路預計在10月加入。 2018年9月宣佈進一步推遲至2019年,2019年5月宣佈再一次推遲至2020年。 (zh)
automatic recharge
  • (en)
  • Mangmoom Topup (en)
credit expiry
maximum credit
minimum credit
sales location
  • MRT ticket offices (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 42 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software