About: Line 2 (Hangzhou Metro)     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:RailwayLine, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/c/6tTSvrbrvi

Line 2 of the Hangzhou Metro (Chinese: 杭州地铁二号线; pinyin: Hángzhōu Dìtiě Èr Hào Xiàn) is a north-south rapid transit line, connecting the downtown with the districts of Xiaoshan and Yuhang in Hangzhou. The first phase of the line, between Qianjiang Road and Chaoyang stations, entered operation on 24 November 2014 after six years of construction. It was extended to Gucui Road on 3 July 2017, and then to Liangzhu on 27 December in the same year.

AttributesValues
rdf:type
rdfs:label
  • Ligne 2 du métro de Hangzhou (fr)
  • Line 2 (Hangzhou Metro) (en)
  • 杭州地下鉄2号線 (ja)
  • 杭州地铁2号线 (zh)
rdfs:comment
  • La Ligne 2 du métro de Hangzhou est la deuxième ligne dans métro de Hangzhou. Elle a ouvert dans 24 novembre 2014 et elle consiste 33 stations à 2018. En maintenant (juillet 2020), toutes les 33 stations sont ouvertes. (fr)
  • Line 2 of the Hangzhou Metro (Chinese: 杭州地铁二号线; pinyin: Hángzhōu Dìtiě Èr Hào Xiàn) is a north-south rapid transit line, connecting the downtown with the districts of Xiaoshan and Yuhang in Hangzhou. The first phase of the line, between Qianjiang Road and Chaoyang stations, entered operation on 24 November 2014 after six years of construction. It was extended to Gucui Road on 3 July 2017, and then to Liangzhu on 27 December in the same year. (en)
  • 杭州地下鉄2号線(こうしゅうちかてつ2ごうせん、中文表記: 杭州地铁2号线、英文表記: Hangzhou Metro Line 2)は、中華人民共和国浙江省杭州市を走る杭州地下鉄の路線。2014年11月24日、最初の区間として13駅18.3kmが開通し、2017年に2度延伸され48kmの路線となった。 (ja)
  • 杭州地铁2号线,标识色为■丹桂橙,自萧山区朝阳站至余杭区良渚站,大致呈西北-东南走向,线路全长42.82公里,设33个站点,车站与线路全部位于地下。分为一期东南段13站,一期西北段11站,以及二期9站三个阶段建设。一期东南段于2014年11月24日开通运营,2017年12月27日,线路全线通车。同时,杭州地铁移动支付过闸项目开始试运行,支持旅客以支付宝扫码、银联闪付方式快速通过闸机,无须排队购票。 (zh)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/20150409杭州地铁2号线人民广场站台.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Hangzhou_Metro_Line_2.svg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Hangzhou_Metro_logo.svg
location
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
stations
stock
dbp:wikiPageUsesTemplate
thumbnail
caption
electrification
  • Overhead, (en)
locale
map state
  • collapsed (en)
open
operator
owner
p
  • Hángzhōu Dìtiě Èr Hào Xiàn (en)
s
  • 杭州地铁二号线 (en)
status
  • Operational (en)
system
Tracks
type
has abstract
  • La Ligne 2 du métro de Hangzhou est la deuxième ligne dans métro de Hangzhou. Elle a ouvert dans 24 novembre 2014 et elle consiste 33 stations à 2018. En maintenant (juillet 2020), toutes les 33 stations sont ouvertes. (fr)
  • Line 2 of the Hangzhou Metro (Chinese: 杭州地铁二号线; pinyin: Hángzhōu Dìtiě Èr Hào Xiàn) is a north-south rapid transit line, connecting the downtown with the districts of Xiaoshan and Yuhang in Hangzhou. The first phase of the line, between Qianjiang Road and Chaoyang stations, entered operation on 24 November 2014 after six years of construction. It was extended to Gucui Road on 3 July 2017, and then to Liangzhu on 27 December in the same year. (en)
  • 杭州地下鉄2号線(こうしゅうちかてつ2ごうせん、中文表記: 杭州地铁2号线、英文表記: Hangzhou Metro Line 2)は、中華人民共和国浙江省杭州市を走る杭州地下鉄の路線。2014年11月24日、最初の区間として13駅18.3kmが開通し、2017年に2度延伸され48kmの路線となった。 (ja)
  • 杭州地铁2号线,标识色为■丹桂橙,自萧山区朝阳站至余杭区良渚站,大致呈西北-东南走向,线路全长42.82公里,设33个站点,车站与线路全部位于地下。分为一期东南段13站,一期西北段11站,以及二期9站三个阶段建设。一期东南段于2014年11月24日开通运营,2017年12月27日,线路全线通车。同时,杭州地铁移动支付过闸项目开始试运行,支持旅客以支付宝扫码、银联闪付方式快速通过闸机,无须排队购票。 (zh)
Character
  • Underground (en)
daily ridership
depot
  • Shuangqiao Stabling Yard (en)
  • Shushan Depot (en)
line length (μ)
number of stations
speed limit (kmh)
prov:wasDerivedFrom
page length (characters) of wiki page
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 50 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software