The Hillingdon Sports and Leisure Complex is a leisure centre in Uxbridge, operated by Fusion Lifestyle on behalf of the London Borough of Hillingdon. The complex is centred on the Grade II listed outdoor swimming pool, known as Uxbridge Lido until 2010, when the newly built centre and refurbished pool were opened. A new indoor pool was built beside the lido as part of the redevelopment works, opening in February 2010, followed a day later by the outdoor pool.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Hillingdon Sports and Leisure Complex (en)
|
rdfs:comment
| - The Hillingdon Sports and Leisure Complex is a leisure centre in Uxbridge, operated by Fusion Lifestyle on behalf of the London Borough of Hillingdon. The complex is centred on the Grade II listed outdoor swimming pool, known as Uxbridge Lido until 2010, when the newly built centre and refurbished pool were opened. A new indoor pool was built beside the lido as part of the redevelopment works, opening in February 2010, followed a day later by the outdoor pool. (en)
|
name
| - Hillingdon Sports and Leisure Complex (en)
|
geo:lat
| |
geo:long
| |
foaf:depiction
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
address
| - Uxbridge (en)
- Gatting Way, (en)
- Park Road, (en)
|
architect
| |
caption
| - The refurbished outdoor pool in May 2010 (en)
|
Closed
| |
footnotes
| - * Also closed 1983-4 (en)
|
opened
| |
operator
| |
owner
| |
postcode
| |
status
| |
georss:point
| - 51.551008333333336 -0.46760277777777776
|
has abstract
| - The Hillingdon Sports and Leisure Complex is a leisure centre in Uxbridge, operated by Fusion Lifestyle on behalf of the London Borough of Hillingdon. The complex is centred on the Grade II listed outdoor swimming pool, known as Uxbridge Lido until 2010, when the newly built centre and refurbished pool were opened. A new indoor pool was built beside the lido as part of the redevelopment works, opening in February 2010, followed a day later by the outdoor pool. The outdoor pool was built in 1935 in the "Moderne" or Art Deco style, at a cost of £24,500. It was closed in 1998 and became subject to heavy vandalism. In 2007 it was announced that the pool would be restored in time to be used as a training pool for the 2012 Summer Olympics. (en)
|
gold:hypernym
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(-0.46760278940201 51.551010131836)
|
is name
of | |