Gevingåsen Tunnel is a 4.4-kilometer (2.7 mi) single track railway tunnel between the villages of Hommelvik and Hell in Trøndelag county, Norway. The tunnel is located along the Nordland Line. Blasting started in 2009, and the tunnel opened on 15 August 2011, having cost 635 million kr. Built by the Norwegian National Rail Administration, the tunnel has shortened travel time south of Stjørdal by five minutes and increased the capacity of the Trondheim–Stjørdal to four trains per hour in each direction.