About: Galisteo Dam     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FGalisteo_Dam&graph=http%3A%2F%2Fdbpedia.org&graph=http%3A%2F%2Fdbpedia.org

Galisteo Dam (National ID # NM00002) is a dam in Santa Fe County, New Mexico. The earthen dam was constructed in 1970 by the United States Army Corps of Engineers with a height of 164 feet and 2820 feet long at its crest. Built solely for flood control and sediment impoundment on Galisteo Creek, with its "long history of violent floods", the main line of the Atchison, Topeka and Santa Fe railroad was relocated to accommodate the project. The dam is owned and operated by the Corps of Engineers.

AttributesValues
rdf:type
rdfs:label
  • Galisteo Dam (en)
rdfs:comment
  • Galisteo Dam (National ID # NM00002) is a dam in Santa Fe County, New Mexico. The earthen dam was constructed in 1970 by the United States Army Corps of Engineers with a height of 164 feet and 2820 feet long at its crest. Built solely for flood control and sediment impoundment on Galisteo Creek, with its "long history of violent floods", the main line of the Atchison, Topeka and Santa Fe railroad was relocated to accommodate the project. The dam is owned and operated by the Corps of Engineers. (en)
foaf:name
  • Galisteo Dam (en)
name
  • Galisteo Dam (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Galisteo_Dam,_Santa_Fe_County_NM.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
thumbnail
country
  • United States (en)
image caption
  • Galisteo Dam (en)
image size
location
location map
  • New Mexico (en)
opening
owner
purpose
georss:point
  • 35.463816 -106.20917
has abstract
  • Galisteo Dam (National ID # NM00002) is a dam in Santa Fe County, New Mexico. The earthen dam was constructed in 1970 by the United States Army Corps of Engineers with a height of 164 feet and 2820 feet long at its crest. Built solely for flood control and sediment impoundment on Galisteo Creek, with its "long history of violent floods", the main line of the Atchison, Topeka and Santa Fe railroad was relocated to accommodate the project. The dam is owned and operated by the Corps of Engineers. The reservoir it creates, Galisteo Reservoir, is ordinarily dry. Its maximum capacity is 152,600 acre-feet. No water recreation is available. Although the approximately five-acre site is open to the public for day use, the site is surrounded by private lands and lands of the Kewa Pueblo. (en)
res capacity total
part
gold:hypernym
prov:wasDerivedFrom
length (km)
page length (characters) of wiki page
height (μ)
length (μ)
opening year
purpose
  • Flood control
owner
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-106.20916748047 35.463817596436)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 51 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software