About: Cross Bay Link     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.org associated with source document(s)
QRcode icon
http://dbpedia.org/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FCross_Bay_Link&graph=http%3A%2F%2Fdbpedia.org&graph=http%3A%2F%2Fdbpedia.org

The Cross Bay Link (Chinese: 將軍澳跨灣連接路) at Junk Bay, New Territories, Hong Kong is an under construction 1.8 km (1.1 mi) bridge that connects the Tseung Kwan O Industrial Estate and LOHAS Park areas with the under construction Tseung Kwan O-Lam Tin Tunnel. The bridge will consist of a road, pedestrian walkways and bicycle lanes.

AttributesValues
rdf:type
rdfs:label
  • Cross Bay Link (en)
  • 將軍澳跨灣連接路 (zh)
rdfs:comment
  • The Cross Bay Link (Chinese: 將軍澳跨灣連接路) at Junk Bay, New Territories, Hong Kong is an under construction 1.8 km (1.1 mi) bridge that connects the Tseung Kwan O Industrial Estate and LOHAS Park areas with the under construction Tseung Kwan O-Lam Tin Tunnel. The bridge will consist of a road, pedestrian walkways and bicycle lanes. (en)
  • 將軍澳跨灣連接路(英語:Tseung Kwan O Cross Bay Link)是香港的一座跨海大橋,於2018年7月12日動工,2022年12月11日上午8時通車,連接路全長1.8公里,其中約1公里為海上高架橋,為全港首條附設單車徑、行人路及觀景台的雙線雙程分隔車道的海上「多功能」高架橋,以高架方式跨過新界西貢區將軍澳,連接將軍澳東岸及西岸,即大赤沙(將軍澳創新園)、小赤沙(日出康城)及調景嶺、將軍澳市中心,也連接將軍澳藍田隧道(6號幹線一部分),將軍澳跨灣連接路則不屬於6號幹線一部分,而此橋亦是全港跨度最大、預製最重的鋼拱橋,車速限制為每小時80公里。 (zh)
foaf:name
  • 將軍澳跨灣連接路 (en)
name
  • Cross Bay Link (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/20100825-TKOBridge-Combined.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/2022年10月-將軍澳跨灣連接路.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/2022年1月的將軍澳跨灣大橋.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Cross_Bay_Link_Tseung_Kwan_O_site_202002.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
toll
  • Free of charge (en)
caption
  • The site of the bridge link in October 2022. (en)
carries
  • Vehicles, pedestrians, bicycles (en)
crosses
design
locale
  • Tseung Kwan O New Town, Hong Kong (en)
native name
  • 將軍澳跨灣連接路 (en)
native name lang
  • zh-Hant (en)
open
georss:point
  • 22.29391111111111 114.25971666666666
has abstract
  • The Cross Bay Link (Chinese: 將軍澳跨灣連接路) at Junk Bay, New Territories, Hong Kong is an under construction 1.8 km (1.1 mi) bridge that connects the Tseung Kwan O Industrial Estate and LOHAS Park areas with the under construction Tseung Kwan O-Lam Tin Tunnel. The bridge will consist of a road, pedestrian walkways and bicycle lanes. (en)
  • 將軍澳跨灣連接路(英語:Tseung Kwan O Cross Bay Link)是香港的一座跨海大橋,於2018年7月12日動工,2022年12月11日上午8時通車,連接路全長1.8公里,其中約1公里為海上高架橋,為全港首條附設單車徑、行人路及觀景台的雙線雙程分隔車道的海上「多功能」高架橋,以高架方式跨過新界西貢區將軍澳,連接將軍澳東岸及西岸,即大赤沙(將軍澳創新園)、小赤沙(日出康城)及調景嶺、將軍澳市中心,也連接將軍澳藍田隧道(6號幹線一部分),將軍澳跨灣連接路則不屬於6號幹線一部分,而此橋亦是全港跨度最大、預製最重的鋼拱橋,車速限制為每小時80公里。 (zh)
gold:hypernym
prov:wasDerivedFrom
length (km)
page length (characters) of wiki page
bridge carries
  • Vehicles, pedestrians, bicycles
height (μ)
length (μ)
opening date
opening year
crosses
located in area
type
foaf:isPrimaryTopicOf
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (61 GB total memory, 51 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software