City Business Center is a complex of five buildings in the Bratislava city district Staré mesto (Old town), first two finished in 2006 and 2007. The complex is bordered by the and , in the area known as Central Business District where more office and business complex projects are now being developed. Originally the complex was to include four administrative (office) buildings and one residential building. The purpose of the last building, CBC V, was changed from residential to office after restarting the construction of second phase.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - City Business Center, Bratislava (en)
- City Business Center (Bratysława) (pl)
|
rdfs:comment
| - City Business Center is a complex of five buildings in the Bratislava city district Staré mesto (Old town), first two finished in 2006 and 2007. The complex is bordered by the and , in the area known as Central Business District where more office and business complex projects are now being developed. Originally the complex was to include four administrative (office) buildings and one residential building. The purpose of the last building, CBC V, was changed from residential to office after restarting the construction of second phase. (en)
- City Business Center – kompleks pięciu budynków w Bratysławie, w dzielnicy miasta Stare Miasto. Pierwsze dwa budynki zostały ukończone w 2006 i 2007. Kompleks graniczy z ulicą Karadžičovą i Dostrojevského rad, w okolicy zwanej Central Business District, gdzie bardziej złożone projekty biurowe i biznesowe są obecnie opracowywane. Pierwotnie kompleks miał składać się z czterech budynków biurowych oraz jednego budynku mieszkalnego. Ostatni budynek, CBC V, został zmieniony z pomieszczeń mieszkaniowych na biurowe po wznowieniu budowy drugiej fazy. (pl)
|
foaf:name
| - City Business Center (en)
|
name
| - City Business Center (en)
|
geo:lat
| |
geo:long
| |
foaf:depiction
| |
location
| |
dct:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
architect
| |
building type
| |
caption
| - City Business Center I (en)
|
developer
| |
est completion
| |
floor count
| |
image size
| |
location
| |
opening
| - CBC I - April 2007, CBC II - November 2006 (en)
|
owner
| - HB Reavis Group, Tatra Asset Management (en)
|
roof
| |
status
| |
georss:point
| |
has abstract
| - City Business Center is a complex of five buildings in the Bratislava city district Staré mesto (Old town), first two finished in 2006 and 2007. The complex is bordered by the and , in the area known as Central Business District where more office and business complex projects are now being developed. Originally the complex was to include four administrative (office) buildings and one residential building. The purpose of the last building, CBC V, was changed from residential to office after restarting the construction of second phase. Complex construction consists of two phases. First includes the CBC I, a 107-meter, 25-floor office tower (completed in April 2007) and CBC II, an 8-floor low rise building (completed in November 2006). Construction of the second phase was started in 2008, but after the excavation work was done the construction was put on hold until 2009, when work on the remaining three buildings resumed. CBC III, IV and V offer additional 23,200 m2 (249,700 sq ft) of leasable area for office and retail. In March 2014 HB Reavis Group sold three of the five buildings (CBC III, IV and V) to the company Tatra Asset Management, subsidiary. (en)
- City Business Center – kompleks pięciu budynków w Bratysławie, w dzielnicy miasta Stare Miasto. Pierwsze dwa budynki zostały ukończone w 2006 i 2007. Kompleks graniczy z ulicą Karadžičovą i Dostrojevského rad, w okolicy zwanej Central Business District, gdzie bardziej złożone projekty biurowe i biznesowe są obecnie opracowywane. Pierwotnie kompleks miał składać się z czterech budynków biurowych oraz jednego budynku mieszkalnego. Ostatni budynek, CBC V, został zmieniony z pomieszczeń mieszkaniowych na biurowe po wznowieniu budowy drugiej fazy. Budowa kompleksu składa się z dwóch faz. Pierwszy obejmuje CBC I, 107-metrowa, 25 piętrowa wieża biurowa (ukończona w kwietniu 2007 r.) i CBC II, 8 piętrowy niski budynek (ukończony w listopadzie 2006 r.). Budowa drugiego etapu rozpoczęła się w 2008 r., ale po zakończeniu prac wykopaliskowych prace zostały wstrzymany aż do 2009 roku, kiedy prace nad pozostałymi trzema budynkami zostały wznowione. CBC III, IV i V przyniesie dodatkowo 23 200 m² powierzchni najmu dla powierzchni biurowych i handlowych. Planuje się ukończenie całego kompleksu w 2011 roku. (pl)
|
gold:hypernym
| |
prov:wasDerivedFrom
| |
floor area (m2)
| |
page length (characters) of wiki page
| |
floor area (m2)
| |
height (μ)
| |
status
| |
architect
| |
developer
| |
owner
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(17.12501335144 48.148078918457)
|
is Link from a Wikipage to another Wikipage
of | |
is Wikipage redirect
of | |
is Wikipage disambiguates
of | |
is foaf:primaryTopic
of | |