Chashma Barrage is a barrage on the River Indus in Mianwali District of the Punjab province of Pakistan 304 km NW of Lahore and 56 km downstream of Jinnah Barrage. The contract for Chashma Barrage works was awarded on 10 February 1967 to French Consortium Société Dumez and Société Borie and was successfully completed by 25 March 1971. The total cost of Chashma Barrage works was Rs.399 million but power generation started later in 2001. The installed capacity of power Station is 184 MW, from eight Kaplan-type bulb turbine units, each with a 23 MW capacity. The bulb turbines have been installed for the first time in Pakistan. The first unit was commissioned in January 2001, while final commissioning of all units was completed in July 2001. The 8 Kaplan-type turbines and synchronous generator
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Chashma Barrage (en)
- Ĉaŝma Akvobaraĵo (eo)
- Barrage de Chashma (fr)
- ГЕС Чашма (uk)
|
rdfs:comment
| - Le barrage de Chashma (ourdou : چشمہ_بیراج) est un barrage sur le fleuve Indus dans le district de Mianwali de la province du Pendjab au Pakistan, à 304 km au nord-ouest de Lahore et à environ 56 km en aval du (en). (fr)
- La Ĉaŝma Akvobaraĵo (en urdua: چشمہ بیراج) estas akvobaraĵo sur la rivero Induso en la distrikto Mianvali de la Panĝaba provinco de Pakistano, 304 km nordokcidente de Lahore kaj je 56 km rivermalsupre de la Ĝinnah Akvobaraĵo. La kontrakto por la laboroj por la Ĉaŝma Akvobaraĵo estis atribuita la 10an de februaro 1967 al la Franca Entreprenaro Société Dumez kaj al la Société Borie kaj estis sukcese finkompletigita la 25an de marto 1971. La totala kosto de la laboroj por la Ĉaŝma Akvobaraĵo estis de 399 milionoj da rupioj sed la generado de elektra energio startis poste en 2001. (eo)
- Chashma Barrage is a barrage on the River Indus in Mianwali District of the Punjab province of Pakistan 304 km NW of Lahore and 56 km downstream of Jinnah Barrage. The contract for Chashma Barrage works was awarded on 10 February 1967 to French Consortium Société Dumez and Société Borie and was successfully completed by 25 March 1971. The total cost of Chashma Barrage works was Rs.399 million but power generation started later in 2001. The installed capacity of power Station is 184 MW, from eight Kaplan-type bulb turbine units, each with a 23 MW capacity. The bulb turbines have been installed for the first time in Pakistan. The first unit was commissioned in January 2001, while final commissioning of all units was completed in July 2001. The 8 Kaplan-type turbines and synchronous generator (en)
- ГЕС Чашма — гідроелектростанція на півночі Пакистану. Знаходячись після ГЕС Джіннан, становить нижній ступінь каскаду на річці Інд. У 1967—1971 роках на Інді з метою іригації звели греблю Чашма довжиною 1084 метри, яка утворила водосховище з площею поверхні 355 км2 та об'ємом 1073 млн м3 (через чотири десятки років внаслідок нанесення осадів скоротився до 429 млн м3). А на початку 2000-х комплекс доповнили гідроелектростанцією, для чого праворуч від греблі прокопали канал довжиною 2,2 км та шириною по дну 136 метрів, який приблизно посередині перекриває руслова будівля машинного залу. Тут встановлено вісім бульбових турбін потужністю по 23 МВт, котрі використовують напір від 3 до 13,8 метра та забезпечують виробництво 688 млн кВт·год. (uk)
|
foaf:name
| |
name
| |
geo:lat
| |
geo:long
| |
foaf:depiction
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
cost
| |
extra
| |
image caption
| - Chashma Barrage Lake (en)
|
location
| |
location map
| |