Carrigadrohid hydroelectric power station is a hydroelectric plant located on the River Lee in County Cork, Ireland. It is owned and operated by the ESB Group. The dam is 130 m (427 ft) long and has a single 8 MW (11,000 hp) Kaplan turbine which produces an average of 22 GWh (79 TJ) each year. Built between 1952 and 1957. the construction of Carrigadrohid required the destruction of over half of the Gearagh, an ancient alluvial forest, and initially harmed local wildlife. However, subsequently the area has seen the growth of an ecosystem with kingfishers, otters, salmon and swans, which has been designated European Union Special Area of Conservation.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Carrigadrohid hydroelectric power station (en)
|
rdfs:comment
| - Carrigadrohid hydroelectric power station is a hydroelectric plant located on the River Lee in County Cork, Ireland. It is owned and operated by the ESB Group. The dam is 130 m (427 ft) long and has a single 8 MW (11,000 hp) Kaplan turbine which produces an average of 22 GWh (79 TJ) each year. Built between 1952 and 1957. the construction of Carrigadrohid required the destruction of over half of the Gearagh, an ancient alluvial forest, and initially harmed local wildlife. However, subsequently the area has seen the growth of an ecosystem with kingfishers, otters, salmon and swans, which has been designated European Union Special Area of Conservation. (en)
|
foaf:name
| - Carrigadrohid hydroelectric power station (en)
|
name
| - Carrigadrohid hydroelectric power station (en)
|
geo:lat
| |
geo:long
| |
foaf:depiction
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
spillway count
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
location map
| |
opening
| |
owner
| |
status
| |
georss:point
| |
has abstract
| - Carrigadrohid hydroelectric power station is a hydroelectric plant located on the River Lee in County Cork, Ireland. It is owned and operated by the ESB Group. The dam is 130 m (427 ft) long and has a single 8 MW (11,000 hp) Kaplan turbine which produces an average of 22 GWh (79 TJ) each year. Built between 1952 and 1957. the construction of Carrigadrohid required the destruction of over half of the Gearagh, an ancient alluvial forest, and initially harmed local wildlife. However, subsequently the area has seen the growth of an ecosystem with kingfishers, otters, salmon and swans, which has been designated European Union Special Area of Conservation. (en)
|
construction began
| |
dam type
| |
plant capacity
| |
plant commission
| |
plant turbines
| |
vastest lake
| |
part
| |
building start year
| |
prov:wasDerivedFrom
| |
length (km)
| |
page length (characters) of wiki page
| |
building start date
| |
description
| |
height (μ)
| |
length (μ)
| |
opening year
| |
status
| |
owner
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(-8.8638200759888 51.897174835205)
|